โ† Back to Daily Permits

๐Ÿ›ข๏ธ LOGAN FED 4-9-16 2HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #42761 ยท Generated 2026-03-16 18:04

API
3305310765
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Well approved pursuant to Commission Order No. 34507 with specific setbacks based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section
Non-standard setback calculations tied to completion design, indicating operator's intent to optimize lateral placement for regulatory compliance in off-spacing unit.
2026-03-12 Directional Drilling
Tier 3 Notification to BLM for potential federal permit in spacing unit Sections 4, 9, 16-T145N-R98W.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Doug Jackson dated 3/11/2026
Involvement of federal oversight for tribal or federal lands, adding regulatory layer.
2026-03-11 Drilling Rigs
Tier 3 Drilling operations will utilize a closed loop system with cuttings disposed at Select Water Solutions, LLC Special Waste Landfill in Arnegard, ND.
๐Ÿ“„ Disposal of Drill Cuttings section
Explicit selection of a specific licensed disposal facility, deviating from generic closed-loop requirements.
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk at 701-590-5317 prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Pre-construction regulatory checkpoint not typical in all permits, suggesting heightened scrutiny or site-specific risks.
Unknown General Oilfield Services
Tier 3 Operator acknowledges notice requirements to adjacent operators within 2640 feet, including 24-hour emergency contacts and planned dates.โฐ TIME-SENSITIVE
๐Ÿ“„ Operator Assertions section
Mandatory inter-operator communication for wells in same or adjacent pools, highlighting potential for coordinated operations.
Unknown General Oilfield Services
Tier 3 Operator will not use diesel-based compounds in hydraulic stimulation, listing specific CAS numbers.
๐Ÿ“„ Stimulation section
Proactive exclusion of certain additives, potentially driven by environmental or regulatory preferences.
Unknown General Oilfield Services
Tier 3 Surface use agreement obtained for off-spacing drilling from pad in Section 32, covering multiple wells.
๐Ÿ“„ Affidavit of Surface Damage Agreement
Explicit off-spacing approval via landowner agreement, enabling multi-well pad development.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental and waste management
Closed-loop system and specific disposal at Select Water Solutions landfill require immediate vendor engagement post-spud.
Regulatory consulting and surveying
BLM notification and NDIC inspector contact needed before construction; Uintah surveying already utilized for plats.
Completion and stimulation
Wet shoe design and diesel-free stimulation imply specialized services; timing tied to lateral drilling post-11862' MD.