โ† Back to Daily Permits

๐Ÿ›ข๏ธ LOGAN FED 4-9-16 3HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #42762 ยท Generated 2026-03-16 18:05

API
3305310766
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wellbore design includes a wet shoe with ability to frac out the toe, backed up by hydraulic toe sleeve and ball seat
๐Ÿ“„ Proposed Drilling Plan and Tubular Details
Non-standard completion design for toe preparation, suggesting intent to optimize fracturing efficiency in horizontal laterals
Unknown Completions / Frac
Tier 3 Notification to adjacent operator Rockport Energy Solutions, LLC regarding off-spacing drilling plans, including trajectory and timing detailsโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit section
Required disclosure for off-spacing wells, revealing inter-operator coordination and potential for collaborative or competitive dynamics
2026-03-11 General Oilfield Services
Tier 3 Requirement for a covered leak-proof container for filter sock disposal on-site during spud, clean-out, completion, and flow-back
๐Ÿ“„ Page 2 and attached letter dated May 30, 2025
Mandates specialized waste management setup beyond basic permit requirements, reflecting heightened environmental compliance in Bakken operations
2025-05-30 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2
Pre-selects a specific inspector for oversight, indicating potential for expedited or customized regulatory interaction not standard in permits
Unknown General Oilfield Services
Tier 3 Drill cuttings disposal specified to Select Water Solutions, LLC Special Waste Landfill in Arnegard, ND
๐Ÿ“„ Disposal of Drill Cuttings section
Pre-selects a specific licensed facility for cuttings, deviating from generic disposal options
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Waste management and disposal
Immediate need for on-site filter sock containers upon spud and cuttings disposal to Select Water Solutions, with operations starting post-approval on 2026-03-12
Regulatory and inspection coordination
Pre-construction contact with Doug Dolyniuk required before location work, timed around permit publication and approval