| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wellbore design includes a wet shoe with ability to frac out the toe, backed up by hydraulic toe sleeve and ball seat ๐ Proposed Drilling Plan and Tubular Details Non-standard completion design for toe preparation, suggesting intent to optimize fracturing efficiency in horizontal laterals |
Unknown | Completions / Frac |
| Tier 3 |
Notification to adjacent operator Rockport Energy Solutions, LLC regarding off-spacing drilling plans, including trajectory and timing detailsโฐ TIME-SENSITIVE ๐ Affidavit section Required disclosure for off-spacing wells, revealing inter-operator coordination and potential for collaborative or competitive dynamics |
2026-03-11 | General Oilfield Services |
| Tier 3 |
Requirement for a covered leak-proof container for filter sock disposal on-site during spud, clean-out, completion, and flow-back ๐ Page 2 and attached letter dated May 30, 2025 Mandates specialized waste management setup beyond basic permit requirements, reflecting heightened environmental compliance in Bakken operations |
2025-05-30 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2 Pre-selects a specific inspector for oversight, indicating potential for expedited or customized regulatory interaction not standard in permits |
Unknown | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal specified to Select Water Solutions, LLC Special Waste Landfill in Arnegard, ND ๐ Disposal of Drill Cuttings section Pre-selects a specific licensed facility for cuttings, deviating from generic disposal options |
Unknown | General Oilfield Services |