| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Lateral design includes a wet shoe with ability to frac out the toe, backed by hydraulic toe sleeve and ball seat. ๐ Page 5 of 10 (Proposed Work) Non-standard toe design for frac initiation, suggesting advanced completion techniques to ensure toe access without sidetracks. |
Unknown | Completions / Frac |
| Tier 3 |
Drill cuttings disposal to Select Water Solutions, LLC Special Waste Landfill at 13195 26th St NW, Arnegard, ND. ๐ Page 4 of 10 (Proposed Drilling Plan) Specifies a pre-selected disposal vendor, indicating a preferred ecosystem partner for waste management in a closed-loop system. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must provide prior written notice (21-31 days) to operators of adjacent pools if completions are within 2640 feet, including emergency contacts and planned dates.โฐ TIME-SENSITIVE ๐ Page 7 of 10 Enforces inter-operator communication for completions, revealing potential for frac interference or scheduling conflicts. |
Relative | Completions / Frac |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk at 701-590-5317 prior to location construction.โฐ TIME-SENSITIVE ๐ Page 2 of 10 Requires pre-construction regulatory coordination beyond standard permitting, indicating potential for site-specific inspections or modifications. |
Relative | General Oilfield Services |
| Tier 3 |
Well must be drilled in conjunction with another well meeting 1220' setback from east and west spacing unit boundaries to justify the 1920-acre unit. ๐ Page 2 of 10 Imposes sequencing dependency on drilling operations, potentially delaying this well until a companion well is completed or planned. |
Unknown | Drilling Rigs |
| Tier 3 |
Stimulation excludes diesel-based compounds (CAS numbers listed). ๐ Page 5 of 10 (Proposed Work) Regulatory-driven fluid restriction, indicating environmental compliance choices that may limit certain frac fluid suppliers. |
Unknown | Completions / Frac |