โ† Back to Daily Permits

๐Ÿ›ข๏ธ LOGAN FED 4-9-16 4HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #42763 ยท Generated 2026-03-16 18:05

API
3305310767
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Lateral design includes a wet shoe with ability to frac out the toe, backed by hydraulic toe sleeve and ball seat.
๐Ÿ“„ Page 5 of 10 (Proposed Work)
Non-standard toe design for frac initiation, suggesting advanced completion techniques to ensure toe access without sidetracks.
Unknown Completions / Frac
Tier 3 Drill cuttings disposal to Select Water Solutions, LLC Special Waste Landfill at 13195 26th St NW, Arnegard, ND.
๐Ÿ“„ Page 4 of 10 (Proposed Drilling Plan)
Specifies a pre-selected disposal vendor, indicating a preferred ecosystem partner for waste management in a closed-loop system.
Unknown Mud / Fluids
Tier 3 Operator must provide prior written notice (21-31 days) to operators of adjacent pools if completions are within 2640 feet, including emergency contacts and planned dates.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 7 of 10
Enforces inter-operator communication for completions, revealing potential for frac interference or scheduling conflicts.
Relative Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk at 701-590-5317 prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10
Requires pre-construction regulatory coordination beyond standard permitting, indicating potential for site-specific inspections or modifications.
Relative General Oilfield Services
Tier 3 Well must be drilled in conjunction with another well meeting 1220' setback from east and west spacing unit boundaries to justify the 1920-acre unit.
๐Ÿ“„ Page 2 of 10
Imposes sequencing dependency on drilling operations, potentially delaying this well until a companion well is completed or planned.
Unknown Drilling Rigs
Tier 3 Stimulation excludes diesel-based compounds (CAS numbers listed).
๐Ÿ“„ Page 5 of 10 (Proposed Work)
Regulatory-driven fluid restriction, indicating environmental compliance choices that may limit certain frac fluid suppliers.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Waste disposal
Closed-loop mud system requires immediate disposal contracting with Select Water Solutions; timing tied to spudding and operations.
Frac services
Wet shoe and toe-frac design signals need for specialized completion tools upon reaching TD; urgency from lateral length (28,388' MD).