โ† Back to Daily Permits

๐Ÿ›ข๏ธ T JOHNSON FED 32-5-8 3HFR

Phoenix Operating LLC ยท Mountrail County, ND ยท File #42785 ยท Generated 2026-04-04 16:49

API
3306105666
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Waiver granted for 3-day waiting period due to pre-constructed pad and rig on siteโฐ TIME-SENSITIVE
๐Ÿ“„ Permit approval section and affidavit
Accelerates drilling start beyond standard regulatory wait, indicating urgency and pre-positioned assets
2026-03-25 Drilling Rigs
Tier 3 Contact with BLM for federal mineral permit coordination
๐Ÿ“„ Email from Todd Holweger
Involves federal oversight in spacing unit, adding regulatory layer beyond state permit
2026-03-25 General Oilfield Services
Tier 3 Notification to adjacent operator Slawson Exploration Company for off-spacing wellbore traversal
๐Ÿ“„ Affidavit section
Required disclosure for wells entering adjacent units, revealing inter-operator coordination not standard in permits
2026-03-24 General Oilfield Services
Tier 3 High working interest of 74.56% in 1920-acre spacing unit
๐Ÿ“„ Affidavit of Working Interest
Majority ownership suggests operator control and reduced JV complexity, not evident from basic filings
2026-03-24 General Oilfield Services
Tier 3 Use of wet shoe with ability to frac out the toe
๐Ÿ“„ Completion and perforation section
Non-standard toe design enabling frac initiation, differing from dry shoes and indicating advanced completion intent
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Immediate need for trajectory planning and MWD tools as permit approved and rig positioned
Waste management and disposal
Required during drilling phase with closed system, aligning with spud timing
Hydraulic fracturing equipment
Wet shoe design signals upcoming frac operations post-drilling