๐Ÿ›ข๏ธ CADDYSHACK 22-23-24 1H

Phoenix Operating LLC ยท Divide County, ND ยท File #42786 ยท Generated 2026-04-04 16:49

API
3302301787
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Waiver granted for backbuild order notification since Phoenix Operating LLC operates adjacent spacing units, per NDIC Orders 31848 & 31973
๐Ÿ“„ Letter dated 2/9/2026 from Phoenix Energy to NDIC
Bypasses standard notification requirements due to operator overlap, simplifying regulatory path for horizontal drilling through adjacent units
2026-02-09 Directional Drilling
Tier 3 Requirement to submit all cores, core chips, and samples to ND Geological Survey within 30 days of drilling completion for cuttings and 180 days for cores, with potential extension via Form 4 Sundry Noticeโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Cores and Samples letter dated 3/30/2026
Mandates accelerated post-drilling sample handling beyond standard permit timelines, indicating regulatory emphasis on preservation and analysis
2026-03-30 General Oilfield Services
Tier 3 Surface use agreement executed with landowner Thomas & Mary Dhuyvetter for off-spacing wells on the pad, covering multiple wells including CADDYSHACK series
๐Ÿ“„ Affidavit of Surface Damage Agreement dated 3/20/2026
Enables drilling outside standard spacing units, indicating intent for multi-well pad development
2026-03-20 General Oilfield Services
Tier 3 Operator must provide written notice to adjacent operators 21-31 days prior to completion intervals within 2640 feet, including emergency contacts and schedulesโฐ TIME-SENSITIVE
๐Ÿ“„ Page 7, Operator Assertions
Requires proactive coordination for off-spacing or adjacent completions, not routine in all permits
Relative Completions / Frac
Tier 3 Use of closed mud system with no cuttings pit and disposal of drill cuttings to Smoky Butte Environmental LLC at 13310 94th Street NW, Fortuna, ND 58844
๐Ÿ“„ Page 2, Drilling Plan section 4
Specifies environmental compliance design choice for cuttings management, pre-selecting a licensed disposal vendor
Unknown Mud / Fluids
Tier 3 Commitment to not use diesel-based compounds in hydraulic stimulation, listing prohibited CAS numbers
๐Ÿ“„ Page 2, Stimulation section 5
Non-standard fluid restriction for frac operations, aligning with regulatory or environmental preferences
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental waste disposal
Closed mud system requires immediate cuttings handling during drilling, with Smoky Butte Environmental LLC pre-selected
Directional drilling and surveying
Taktikal Directional involved in planning and surveys, with operations potentially starting soon after permit approval on 3/25/2026
Core and sample analysis
Mandatory submission within 30 days of drilling completion creates post-drilling window for lab services