| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Use of wet shoe sub with ability to frac out the toe, including backup hydraulic toe sleeve. ๐ PROPOSED WORK, Well: CADDYSHACK 22-23-24 2H, Page 7 of 10 Non-standard completion design allowing toe fracturing, differing from dry shoe norms and indicating advanced frac readiness. |
Unknown | Completions / Frac |
| Tier 3 |
Waiver for backbuild order granted due to operator owning adjacent spacing units, allowing drilling outside target unit without additional notifications. ๐ Letter dated February 9th, 2026, SUBJECT: SPACKLER Pad... Backbuild Order Waiver Bypasses standard regulatory notification requirements for off-spacing drilling, indicating operator's integrated control over multiple units. |
2026-02-09 | Regulatory / Permitting |
| Tier 3 |
Requirement to contact NDIC Field Inspector Robert Stafford prior to location construction.โฐ TIME-SENSITIVE ๐ STIPULATIONS, Page 2 of 10, Date: 3/25/2026 Imposes pre-construction regulatory checkpoint not universally required, potentially delaying operations if inspector unavailable. |
Relative | General Oilfield Services |
| Tier 3 |
Commitment to no diesel-based compounds in hydraulic stimulation, listing prohibited CAS numbers. ๐ 5. STIMULATION, Well: CADDYSHACK 22-23-24 2H Voluntary restriction beyond basic regulations, aligning with environmental preferences and potentially increasing costs. |
Unknown | Completions / Frac |