โ† Back to Daily Permits

๐Ÿ›ข๏ธ CADDYSHACK 22-23-24 4H

Phoenix Operating LLC ยท Divide County, ND ยท File #42789 ยท Generated 2026-04-04 16:50

API
3302301790
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Use of wet shoe with ability to frac out the toe, including backup hydraulic toe sleeve and ball seat for testing.
๐Ÿ“„ Completion details and liner description
Advanced completion design for toe initiation without wireline, enabling efficient lateral access and reducing operational risks.
Unknown Completions / Frac
Tier 3 Requirement to submit drill cuttings samples within 30 days of drilling completion and cores within 180 days, with potential extension approval via Form 4.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 1-2, Cores and Samples letter dated 3/30/2026
Imposes strict post-drilling deadlines for sample submission, differing from standard permit timelines and requiring proactive logistics planning.
2026-03-30 Drilling Rigs
Tier 3 Pad hosts multiple wells including off-spacing units (e.g., Caddyshack series), with surface use agreement covering all.
๐Ÿ“„ Affidavit of Surface Damage Agreement dated March 20, 2026
Consolidated multi-well development from single pad, optimizing surface footprint and costs for off-spacing targets.
2026-03-20 General Oilfield Services
Tier 3 Waiver request for backbuild order notification to adjacent units, justified by operator owning those units (Phoenix Energy).
๐Ÿ“„ Letter dated February 9th, 2026, to NDIC
Streamlines permitting for multi-well pad by avoiding external notifications, revealing operator's integrated asset control.
2026-02-09 Regulatory / Permitting
Tier 3 Use of specialized cement additives including Type III with 6% salt, 2% Calseal, 2% Econolite, 0.3% Versaset, and 0.25% Fe-2 for surface casing, and Class G/POZ with silicate, gel, dispersant, FL, retarder, and viscosifier for intermediate and production.
๐Ÿ“„ Proposed Cementing Program section
Non-standard cement formulations tailored for zonal isolation and strength, beyond basic API classes, indicating intent for enhanced well integrity in challenging formations.
Unknown General Oilfield Services
Tier 3 Prohibition on diesel-based compounds in hydraulic stimulation, excluding CAS numbers 68334-30-5, 68476-34-6, etc.
๐Ÿ“„ Stimulation section
Regulatory-driven choice to avoid diesel, potentially opting for water-based or alternative fluids, signaling environmental compliance focus.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental waste disposal
Closed-loop cuttings disposal to Smoky Butte required immediately post-drilling; signals urgent need for hauling services to avoid regulatory penalties.
Directional drilling and surveying
Taktikal Directional's plans and surveys dated February 2026 indicate pre-spud preparation; opportunity for rig mobilization and survey tool deployment.
Completion tools and stimulation
Wet shoe and no-diesel frac design imply near-term demand for specialized liners and water-based fluids upon reaching TD.