| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Anticipated drilling commencement on July 1, 2026, with approximately 30 drilling days and 30 completion daysโฐ TIME-SENSITIVE ๐ Drill Plan - ANTICIPATED STARTING DATES Specific timeline for operations in a high-activity basin |
2026-07-01 | General Oilfield Services |
| Tier 3 |
Waiver requested on notification to adjacent operator under drill-back policy since Oasis owns the adjacent spacing unit ๐ Notification Letter dated October 30, 2025 Non-routine waiver leveraging operator ownership to bypass standard notification requirements |
2025-10-30 | Regulatory / Permitting |
| Tier 3 |
Use of wet shoe configuration on production liner to enable pump-down perforating guns on wireline, avoiding tubing or tractor methods ๐ Drill Plan - Wet Shoe Details Specific liner design choice for cost-effective toe initiation in horizontal completions |
Unknown | Completions / Frac |
| Tier 3 |
Request for waiver on open hole logs, planning only cement bond log from deepest intermediate casing to surface casing shoe ๐ Page 4 - PROPOSED LOGS Waiving open hole logs is non-routine in Bakken wells, potentially to reduce costs or due to specific formation knowledge |
Relative | Regulatory / Permitting |
| Tier 3 |
Explicit commitment to not use diesel-based compounds in hydraulic stimulation fluids ๐ Drill Plan - DIESEL BASED STIMULATION FLUIDS/COMPOUNDS Proactive avoidance of diesel in fracs, beyond standard regulations |
Unknown | Completions / Frac |