โ† Back to Daily Permits

๐Ÿ›ข๏ธ Rosencrans 5892 43-21 2B

Oasis Petroleum North America LLC ยท Mountrail County, ND ยท File #42795 ยท Generated 2026-04-04 16:52

API
3306105667
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration in production liner design, intentionally over-displaced by 7 barrels to create uncemented annulus for economic toe initiation via pump-down of first stage perforating guns.
๐Ÿ“„ Section 1.11.1 and Fig. 1.1 Full Well Diagram
Non-standard liner cementing approach to enable wireline perforating without tubing or tractor, reducing operational costs in horizontal completions.
Unknown Completions / Frac
Tier 3 Waiver requested for notification to adjacent operator under Order No. 31848, as Oasis operates the adjacent spacing unit.
๐Ÿ“„ Letter dated February 19th, 2026, RE: Rosencrans wells
Bypasses standard regulatory notice requirement, indicating operator control over adjacent acreage and potential for streamlined permitting.
2026-02-19 Regulatory / Permitting
Tier 3 Anticipated drilling commencement on June 7, 2025, with 30 days estimated for drilling and completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates
Specific timeline for operations, despite permit approval in 2026, indicating potential sequencing or error in document.
2025-06-07 Drilling Rigs
Tier 3 Use of indirect heater with setback exemption under Case No. 28949 Order No. 31500, allowing placement within 60 feet of wellhead and 21 feet of oil tank.
๐Ÿ“„ Facility Construction Statement
Non-routine facility design leveraging prior regulatory approval for compact pad layout.
Unknown General Oilfield Services
Tier 3 Anti-collision measures include real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures for wellbore identification, and increased survey frequency near crossings.
๐Ÿ“„ Anti-Collision Statement
Enhanced collision avoidance protocols beyond basic regulatory requirements, indicating high-density drilling in proximity to existing wells.
Unknown Directional Drilling
Tier 3 Closed mud system with no cuttings pit, requiring perimeter berm and specific disposal at licensed facilities.
๐Ÿ“„ Stipulations and New Pad Construction Statement
Environmental design choice for mud management, mandating licensed disposal.
Unknown Mud / Fluids
Tier 3 Commitment to no diesel-based compounds in hydraulic stimulation fluids, listing prohibited CAS numbers.
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS section
Proactive environmental compliance choice, avoiding diesel in favor of alternatives.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and anti-collision services
Anticipated drilling start June 7, 2025, with enhanced survey protocols indicating need for real-time MWD and gamma logging near existing wells.
Waste management and cuttings disposal
Closed system mandates disposal at specific licensed facilities during drilling, with relevance from spud to completion.
Hydraulic fracturing and stimulation chemicals
Diesel-free requirement signals demand for alternative fluid providers post-drilling, timed with completion phase.