๐Ÿ›ข๏ธ Rosencrans 5892 43-21 3B

Oasis Petroleum North America LLC ยท Mountrail County, ND ยท File #42796 ยท Generated 2026-04-04 16:52

API
3306105668
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on 4-1/2" liner for toe initiation, enabling wireline pump-down of first stage perforating guns instead of more expensive tubing or tractor methods.
๐Ÿ“„ Section 1.11 Wet Shoe discussion in drilling program attachment.
Non-standard liner design choice to reduce completion costs by avoiding coiled tubing or tractor conveyance for initial perforations.
Unknown Completions / Frac
Tier 3 Waiver requested for hydraulic fracture notification to adjacent operators since Oasis is the operator of the adjacent spacing unit.
๐Ÿ“„ Operator Assertions and February 19th, 2026 letter regarding notification waiver.
Self-operated adjacent units allow bypassing standard 21-31 day notice period, accelerating stimulation timeline.
2026-02-19 Completions / Frac
Tier 3 Anti-collision evaluation using real-time corrected surveys, 1.2 separation safety factor, and gamma ray signatures for wellbore identification, with specific separation factors as low as 0.69 to offset wells.
๐Ÿ“„ Anti-Collision Statement and Total Directional Anti-Collision Report.
Detailed anti-collision protocol beyond standard NDIC requirements, highlighting proximity to multiple offset wells on the same pad and adjacent units.
2026-02-10 Directional Drilling
Tier 3 Anticipated drilling commencement on June 7, 2025, with approximately 30 days for drilling and 30 days for completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates in drilling program.
Specific timeline for operations, indicating rapid pad development with multiple wells.
2025-06-07 General Oilfield Services
Tier 3 Commitment to no diesel-based compounds in hydraulic stimulation fluids, excluding specific CAS numbers.
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS section.
Explicit avoidance of diesel in frac fluids, aligning with regulatory preferences and environmental standards.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and completion services
Drilling starts June 2025 with 30-day window, followed by 30-day completion; wet shoe design favors wireline over tubing for initial perforations.
Surveying and anti-collision services
Real-time surveys and gamma ray logging required during drilling to maintain separation factors as low as 0.69 to offsets.
Waste disposal and environmental services
Licensed facilities selected for dry cuttings, with leak-proof containers for filter socks required from spud.