๐Ÿ›ข๏ธ Rosencrans 5892 43-21 4B

Oasis Petroleum North America LLC ยท Mountrail County, ND ยท File #42797 ยท Generated 2026-04-04 16:53

API
3306105669
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on 4-1/2" liner with intentional over-displacement of cement by 7 barrels, creating ~400' uncemented annulus for economic toe initiation via pump-down perforating guns.
๐Ÿ“„ Attachment 6 in Section 10, Wet Shoe discussion and Fig. 1.1
Non-standard liner cementing to enable cost-saving perforating method, deviating from typical full cement isolation.
Unknown Completions / Frac
Tier 3 Waiver requested for notification to adjacent operator under Order No. 31848, as Oasis is the operator of the adjacent spacing unit.
๐Ÿ“„ Letter dated February 19th, 2026, RE: Rosencrans wells
Self-waiver due to operator control over adjacent unit, simplifying regulatory process in multi-well pad scenario.
2026-02-19 Regulatory / Permitting
Tier 3 Anticipated drilling commencement on June 7, 2025, with completion approximately 30 days thereafter.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates in Attachment 6
Specific timeline for operations in a future-dated permit, providing early visibility into activity window.
2025-06-07 Drilling Rigs
Tier 3 Closed mud system with no cuttings pit, and cuttings disposal to licensed facilities including Chimney Butte Environmental LLC, Dishon Disposal Inc., etc.
๐Ÿ“„ New Pad Construction Statement and Licensed Facilities list in Attachment 6
Mandated environmental compliance choice in a new pad, specifying disposal vendors and closed-loop mud handling.
Unknown Mud / Fluids
Tier 3 Anti-collision measures include AC guidance reporting, real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures for wellbore identification, and surveys every 93'-100' in lateral.
๐Ÿ“„ Anti-Collision Statement in Attachment 6
Detailed, proactive anti-collision protocol beyond standard NDIC requirements, indicating high-risk awareness in dense pad development.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services with gamma ray capabilities
Drilling starts June 7, 2025; anti-collision protocols require frequent surveys and gamma signatures, creating immediate demand for specialized tools in dense pad.
Waste management and cuttings disposal
Closed mud system and listed licensed facilities indicate pre-committed disposal partners; operations commence soon, offering timing for haulage contracts.
Perforating and cementing services
Wet shoe design enables pump-down guns; with drilling starting June 7, 2025, service operators can prepare for efficient, cost-focused completion.