๐Ÿ›ข๏ธ Rosencrans 5892 43-21 5B

Oasis Petroleum North America LLC ยท Mountrail County, ND ยท File #42798 ยท Generated 2026-04-04 16:54

API
3306105670
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 1 Strict setback requirements of 150' north/south and 500' east/west within 1920-acre spacing unit, with production liner cemented in lateral and wet shoe for frac-out capability
๐Ÿ“„ STIPULATIONS section, Page 2
Tighter than standard setbacks to justify spacing unit, requiring specific liner design for frac operations
3/27/2026 Directional Drilling
Tier 2 Wet shoe configuration on 4-1/2" liner with intentional over-displacement by 7 barrels to create uncemented annulus for economic toe initiation via pump-down perforating guns
๐Ÿ“„ Section 1.11.1 and 1.11.2 in Drilling & Proposed Work Statements
Non-standard cementing practice to enable cost-saving perforating method, differing from typical cemented liners
Unknown Completions / Frac
Tier 3 Anti-collision precautions including AC guidance, real-time surveys, 1.2 separation factor, gamma ray signatures, and surveys every 93'-100'
๐Ÿ“„ ANTI-COLLISION STATEMENT in Drilling & Proposed Work Statements
Detailed, non-routine anti-collision protocol beyond basic requirements
Unknown Directional Drilling
Tier 3 Waiver requested for logging, with only Cement Bond Log planned from deepest casing to surface casing shoe
๐Ÿ“„ Section 1.7 Evaluation Program
Opting out of standard porosity/resistivity logs, focusing on cement evaluation
Unknown Regulatory / Permitting
Tier 3 Closed mud system with no cuttings pit, and mandatory use of licensed facilities for dry cuttings disposal (e.g., Chimney Butte Environmental LLC)
๐Ÿ“„ STIPULATIONS and Section 1.10
Environmental compliance choice over open pits, specifying pre-selected disposal vendors
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Anticipated drilling start June 7, 2025, with need for precise anti-collision and survey services
Cementing and liner services
Wet shoe and specific cement programs required during drilling phase starting mid-2025
Waste management and disposal
Mandatory during drilling and completion, with ~30 days completion window post-spud