โ† Back to Daily Permits

๐Ÿ›ข๏ธ RS-Bette-156-92-0129H-2

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42809 ยท Generated 2026-04-07 03:14

API
3306105671
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Approval conditioned on 150' north/south and 500' east/west setbacks within 2400-acre spacing unit, with wet shoe and frac-out capability for production liner.
๐Ÿ“„ STIPULATIONS - Conditions of Approval
Non-standard setback requirements tied to specific cementing and fracturing design, indicating regulatory-driven design constraints not typical in basic permits.
2026-04-02 Completions / Frac
Tier 2 Completion using cemented liner with wet shoe for frac-out, followed by plug and perf method.
๐Ÿ“„ COMPLETION & PERFORATION - COMPLETION INTERVALS
Specific wet shoe and plug-and-perf design for fracturing, not routine in all Bakken completions.
2026-04-02 Completions / Frac
Tier 3 Waiver requested for certain logs, with mandatory porosity and resistivity logs unless approved otherwise.
๐Ÿ“„ GEOLOGIC INFORMATION - PROPOSED LOGS
Selective logging waivers and requirements indicate tailored geological assessment, not standard across permits.
2026-04-02 Regulatory / Permitting
Tier 3 Detailed anti-collision plan including real-time surveys, gamma ray geo-steering, and 1.5 separation factor with risk assessments.
๐Ÿ“„ PROPOSED WORK - Anti-Collision Statement
Comprehensive anti-collision measures exceed basic permit anti-collision assertions, showing proactive risk management in dense well fields.
2026-04-02 Directional Drilling
Tier 3 Requirement for closed mud system with no cuttings pit, remote/automatic shutoff devices, and perimeter berm.
๐Ÿ“„ Conditions of Approval
Environmental and safety stipulations beyond routine permit data, reflecting heightened regulatory scrutiny in the area.
2026-04-02 Mud / Fluids
Tier 3 Survey plat certified by Eric L. Hearon, with specific coordinates and elevations.
๐Ÿ“„ WELL LOCATION PLAT
Detailed surveying for location accuracy, including NAD conversions and found corners.
2026-03-24 General Oilfield Services
Tier 3 Scientific Drilling planning report with anti-collision analysis and trajectory details.
๐Ÿ“„ Planning Report - Scientific Drilling
Third-party anti-collision modeling and planning, beyond operator assertions.
2025-07-03 Directional Drilling
Tier 3 Affidavit confirming no diesel fuels in hydraulic fracturing by Halliburton.
๐Ÿ“„ Hydraulic Fracturing Stimulation using Diesel Fuels
Explicit vendor-specific assurance on fuel use, tied to regulatory compliance for diesel-free fracs.
2022-04-21 Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Surveying
With anti-collision planning dated July 2025 and permit approval in April 2026, immediate need for real-time surveys and geo-steering tools to avoid delays in spudding.
Hydraulic Fracturing
Halliburton affidavit from April 2022 covers ongoing projects, signaling active frac operations; competitors can target diesel-free services for upcoming completions.
Civil Engineering and Pad Construction
KLJ drawings issued January 2025 for review, indicating construction phase approaching permit approval, with urgency for access road improvements and pad grading.
Environmental and Waste Management
Leak-proof container requirement effective June 2014 but reiterated, with operations starting post-publication (3 business days after April 2, 2026), creating immediate demand for compliant disposal services.