โ† Back to Daily Permits

๐Ÿ›ข๏ธ RS-Bette-156-92-0129H-3

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42810 ยท Generated 2026-04-07 03:14

API
3306105672
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 3 Waiver granted for adjacent unit notification under Order 31848 since operator owns both units
๐Ÿ“„ Affidavit for waiver
Self-waiver due to intra-operator adjacency, simplifying permitting in owned acreage
2025-07-15 Regulatory / Permitting
Tier 3 Pad infill design for 6 wells with shared facilities, including access road improvements and stormwater management
๐Ÿ“„ Well Pad Facility Plot Plan and Access Road Improvement Plan
Multi-well pad layout with engineered civil works, indicating large-scale infill development strategy
2025-01-25 General Oilfield Services
Tier 3 Stimulation treatment verified to use Halliburton without diesel fuels identified by specific CAS numbers
๐Ÿ“„ Hydraulic Fracturing Stimulation affidavit
Explicit exclusion of diesel in HF activities, aligning with regulatory compliance and environmental standards
2022-04-21 General Oilfield Services
Tier 3 Cemented liner with wet shoe sub designed for intentional over-displacement by 2 bbls to enable frac out the shoe, with plug and perf for subsequent stages
๐Ÿ“„ Completion Equipment section
Non-standard cementing technique allowing frac operations directly from the shoe, differing from typical dry shoe designs
Unknown Completions / Frac
Tier 3 Anti-collision protocol includes gamma ray geo-steering to actively steer around existing wellbores in the same geologic formation
๐Ÿ“„ Anti-Collision Statement
Advanced geo-steering beyond standard AC calculations, revealing proactive risk mitigation in dense infill development
Unknown Directional Drilling
Tier 3 Waiver requested for porosity and resistivity logs, to be submitted via separate sundryโฐ TIME-SENSITIVE
๐Ÿ“„ PROPOSED LOGS section
Deviation from standard NDIC requirement for logs unless approved, suggesting cost-saving or expedited permitting strategy
Unknown Regulatory / Permitting
Tier 3 Specific centralizer placement on production casing: every joint from TD to 300 ft above KOP, varying density above that
๐Ÿ“„ Production Casing Centralizer Placement
Detailed, non-uniform centralizer spacing tailored to formation intervals, beyond basic casing design
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling with Geo-Steering
Anti-collision report dated 2025-07-03 indicates immediate need for gamma ray tools and real-time surveys to avoid existing wellbores in planned trajectory
Cementing and Centralizer Services
Custom centralizer placement and wet shoe design require specialized cementing contractors prior to casing operations
Hydraulic Fracturing
Halliburton specified for stim, with affidavit dated 2022-04-21 but covering ongoing Bakken wells, signaling readiness for completion phase
Civil Construction and Access Roads
Pad design issued 2025-01-25 for review, implying construction mobilization ahead of dirt work date