| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Waiver granted for adjacent unit notification under Order 31848 since operator owns both units ๐ Affidavit for waiver Self-waiver due to intra-operator adjacency, simplifying permitting in owned acreage |
2025-07-15 | Regulatory / Permitting |
| Tier 3 |
Pad infill design for 6 wells with shared facilities, including access road improvements and stormwater management ๐ Well Pad Facility Plot Plan and Access Road Improvement Plan Multi-well pad layout with engineered civil works, indicating large-scale infill development strategy |
2025-01-25 | General Oilfield Services |
| Tier 3 |
Stimulation treatment verified to use Halliburton without diesel fuels identified by specific CAS numbers ๐ Hydraulic Fracturing Stimulation affidavit Explicit exclusion of diesel in HF activities, aligning with regulatory compliance and environmental standards |
2022-04-21 | General Oilfield Services |
| Tier 3 |
Cemented liner with wet shoe sub designed for intentional over-displacement by 2 bbls to enable frac out the shoe, with plug and perf for subsequent stages ๐ Completion Equipment section Non-standard cementing technique allowing frac operations directly from the shoe, differing from typical dry shoe designs |
Unknown | Completions / Frac |
| Tier 3 |
Anti-collision protocol includes gamma ray geo-steering to actively steer around existing wellbores in the same geologic formation ๐ Anti-Collision Statement Advanced geo-steering beyond standard AC calculations, revealing proactive risk mitigation in dense infill development |
Unknown | Directional Drilling |
| Tier 3 |
Waiver requested for porosity and resistivity logs, to be submitted via separate sundryโฐ TIME-SENSITIVE ๐ PROPOSED LOGS section Deviation from standard NDIC requirement for logs unless approved, suggesting cost-saving or expedited permitting strategy |
Unknown | Regulatory / Permitting |
| Tier 3 |
Specific centralizer placement on production casing: every joint from TD to 300 ft above KOP, varying density above that ๐ Production Casing Centralizer Placement Detailed, non-uniform centralizer spacing tailored to formation intervals, beyond basic casing design |
Unknown | General Oilfield Services |