| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit approved with conditional setbacks requiring production liner cemented in lateral with wet shoe for frac-out capability, enabling tighter boundary spacing in 2400-acre unit.โฐ TIME-SENSITIVE ๐ Permit Information - Stipulation and Conditions of Approval Non-standard setback allowances based on specific cementing and frac techniques, not typical for basic horizontal permits. |
2026-04-02 | Completions / Frac |
| Tier 2 |
Completion design specifies cemented liner with wet shoe for intentional over-displacement by 2 bbls, followed by plug-and-perf stages. ๐ Completion Equipment and Drilling Prognosis sections Wet shoe design allows frac initiation from shoe, a specialized technique not standard in all Bakken completions. |
Unknown | Completions / Frac |
| Tier 3 |
Operator requests waiver for adjacent unit notice under Order 31848, citing self-ownership of adjacent spacing unit, avoiding disclosure of drilling plans to third parties. ๐ Letter from Levi S. Greenly to Todd L. Holweger, dated July 15, 2025 Waiver leverages internal ownership to bypass regulatory disclosure requirements, uncommon in multi-operator fields. |
2025-07-15 | Regulatory / Permitting |
| Tier 3 |
Anti-collision report shows planned wellbore within 1.5 separation factor of existing wells, using gamma ray geo-steering and real-time surveys every 93-100 ft. ๐ Anti-Collision Statement and Report dated 03 July, 2025 Detailed anti-collision protocols exceed basic permit requirements, highlighting proactive risk management in dense infill pad. |
2025-07-03 | Directional Drilling |