๐Ÿ›ข๏ธ RS-Bette- 156-92-0128H-5

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42812 ยท Generated 2026-04-07 03:15

API
3306105674
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval granted under Commission Order No. 35267 with specific 150' north/south and 500' east/west setbacks within 2400-acre spacing unit, requiring production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ STIPULATIONS - Conditions of Approval
Non-standard setback requirements and wet shoe design indicate tailored regulatory compliance for infill drilling in a defined pool, differing from typical Bakken permits.
2026-04-02 Completions / Frac
Tier 3 Anti-collision precautions include AC guidance from certified planners, real-time corrected surveys, 1.5 separation factor, gamma ray geo-steering around existing laterals, and surveys every 93-100 ft increasing as needed.
๐Ÿ“„ PROPOSED WORK - Anti-Collision Statement
Detailed anti-collision strategy with gamma ray geo-steering and frequent surveys is advanced and not routine for all horizontal wells, indicating high-density infill development.
2026-04-02 Directional Drilling
Tier 3 Closed mud system with no cuttings pit, remote/automatic shutoff devices, and specific NDIC Field Inspector contact (Dylan Roach) for location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification
Environmental and safety measures exceed basic permit requirements, specifying inspector contact and equipment, not standard in all NDIC filings.
2026-04-02 Mud / Fluids
Tier 3 Anti-collision report shows minimum separation factors as low as 0.013 (Level 1) with nearby wells like RS-Aadnes-157-91-2829H-1, using ISCWS A error model and pedal curve method.
๐Ÿ“„ Anticollision Report
Quantitative anti-collision analysis with specific factors and methods is non-routine, revealing proximity to offset wells and risk mitigation strategies.
2025-07-03 Directional Drilling
Tier 3 Affidavit confirms Halliburton Energy Services used for hydraulic fracturing without specified diesel fuels (CAS 68334-30-5, etc.), covering all Hess Bakken wells.
๐Ÿ“„ Hydraulic Fracturing Stimulation using Diesel Fuels affidavit
Explicit vendor selection for stimulation and diesel-free assurance is a pre-selected contractor choice, not implied in basic permit data.
2022-04-21 Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Surveying
With anti-collision report dated July 2025 and permit approval in April 2026, services are needed immediately for pre-spud planning and real-time execution to meet 93-100 ft survey frequency.
Hydraulic Fracturing
Halliburton pre-selected, with spud notification required upon commencement, creating urgency for frac crews and proppant logistics post-drilling.
Environmental and Waste Management
Closed mud system and filter sock container requirements effective June 2014 but reaffirmed, signal ongoing need for waste disposal services during operations starting soon after approval.