| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Approval granted with condition for wet shoe on production liner to enable frac out the shoe, allowing first stage frac through the shoe. ๐ Stipulation - Conditions of Approval Non-standard completion design enabling frac operations directly through the shoe, differing from typical plug-and-perf methods. |
2026-04-02 | Completions / Frac |
| Tier 3 |
Requirement for closed mud system with no cuttings pit. ๐ Conditions of Approval Mandated environmental control measure beyond basic permit, requiring specialized mud handling equipment. |
2026-04-02 | Mud / Fluids |
| Tier 3 |
Anti-collision standards include gamma ray geo-steering to avoid existing wellbores in same formation. ๐ Anti-Collision Statement Advanced geo-steering technique for collision avoidance, beyond basic separation factors. |
2026-04-02 | Directional Drilling |
| Tier 3 |
Mandatory remote or automatic shutoff devices on all equipment. ๐ Conditions of Approval Safety regulation requiring automated controls, not standard in all permits. |
2026-04-02 | General Oilfield Services |
| Tier 3 |
Waiver requested for adjacent unit notice under Order 31848 because operator owns the adjacent unit. ๐ Letter from Levi S. Greenly dated July 15, 2025 Self-waiver for inter-unit communication, unique to operator-owned adjacent spacing. |
2025-07-15 | Regulatory / Permitting |
| Tier 3 |
Detailed anti-collision report with separation factors and ellipse calculations against multiple offset wells.โฐ TIME-SENSITIVE ๐ Anticollision Report dated 7/3/2025 Comprehensive risk assessment with specific well proximities, including level warnings. |
2025-07-03 | Directional Drilling |
| Tier 3 |
Affidavit confirming Halliburton does not use specified diesel fuels in hydraulic fracturing. ๐ Affidavit from Rachelle Williamson dated April 21, 2022 Pre-selected vendor assurance on fuel types, tied to regulatory compliance. |
2022-04-21 | Completions / Frac |