| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Requirement for closed mud system with no cuttings pit and remote/automatic shutoff devicesโฐ TIME-SENSITIVE ๐ Stipulations Mandated environmental controls not typical in all permits, enforcing stricter waste management |
2026-04-07 | Mud / Fluids |
| Tier 3 |
Surface Use Agreement executed for drilling into off-lease units, with affidavit affirming landowner awareness ๐ Affidavit Affirming Surface Use Agreement Formal agreement for off-spacing horizontal drilling, enabling multi-unit development from single pad |
2026-04-01 | General Oilfield Services |
| Tier 3 |
Drill-back notification provided to adjacent operator (Devon Energy) with wellbore diagram, start date, and contact infoโฐ TIME-SENSITIVE ๐ Affidavit Affirming Drill-Back Notification Proactive communication for potential interference in adjacent spacing unit, per NDIC Order 31973 |
2025-09-25 | Completions / Frac |
| Tier 3 |
Use of indirect heater with NDIC exemption for 60-foot setback from wellhead and 21-foot from oil tank ๐ Facility Statement Non-standard facility design allowing closer proximity to wellhead, potentially enabling cost savings or space optimization on pad |
Unknown | Regulatory / Permitting |
| Tier 3 |
Anti-collision precautions including AC guidance reporting, real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures, and increased survey frequency near crossings ๐ Anti-Collision Statement Detailed anti-collision protocol beyond basic permit requirements, indicating proactive risk management in dense well field |
Unknown | Directional Drilling |
| Tier 3 |
Commitment to no diesel-based compounds in hydraulic stimulation fluids, excluding specific CAS numbers ๐ Diesel Based Stimulation Fluids/Compounds Explicit avoidance of diesel in stim fluids, differing from standard practices and aligning with environmental preferences |
Unknown | General Oilfield Services |