โ† Back to Daily Permits

๐Ÿ›ข๏ธ STATE WOLF FEDERAL 5102 43-33 4B

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #42817 ยท Generated 2026-04-08 03:32

API
3305310772
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Execution of Surface Use Agreement with landowner for off-spacing drilling into adjacent units, affirmed via affidavit dated 04/01/2026.
๐Ÿ“„ Affidavit Affirming Surface Use Agreement
Formal agreement enabling horizontal drilling outside spacing unit, pursuant to Order 31973, revealing intent to access off-lease reserves.
2026-04-01 General Oilfield Services
Tier 3 Notification provided to adjacent operator (Devon Energy) for drill-back operations, including wellbore diagram, approximate drilling start date, and contact info, via email on 09/25/2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Proactive compliance with Order 31973 for adjacent unit notification, signaling coordinated operations and potential frac timing overlaps.
2025-09-25 Completions / Frac
Tier 3 Facility design uses indirect heater with NDIC exemption under Case No. 28949 Order No. 31500, allowing placement within 60 feet of wellhead and 21 feet of oil tank.
๐Ÿ“„ Page 8 of 10, Facility Statement
Non-standard facility design choice leveraging regulatory exemption for closer equipment placement, potentially reducing pad size or costs compared to typical setups.
Unknown General Oilfield Services
Tier 3 Selection of specific licensed facilities for dry cuttings disposal, including Chimney Butte Environmental LLC, Petrocomp, Dishon Disposal Inc, Ideal Oilfield Disposal LLC, IHD Solids Management LLC, Prairie Disposal LLC, Secure Energy Services, and Tervita Corporation, prioritizing closest available facility.
๐Ÿ“„ Licensed Facilities for Solid Drill Cuttings Disposal section
Pre-selected ecosystem of disposal vendors, not a standard permit requirement, suggesting optimized logistics or preferred partnerships.
Unknown General Oilfield Services
Tier 3 Anti-collision strategy includes AC guidance from certified well planners, real-time corrected surveys, 1.2 separation safety factor, and gamma ray signatures to identify existing wellbore paths.
๐Ÿ“„ Anti-Collision Statement
Advanced anti-collision techniques beyond basic surveying, indicating high-risk proximity to offsets and proactive risk management.
Unknown Directional Drilling
Tier 3 Operator commits to no diesel-based compounds in hydraulic stimulation fluids, explicitly excluding CAS Registry Numbers 68334-30-5, 68476-34-6, 68476-30-2, 68476-31-3, and 8008-20-6.
๐Ÿ“„ Diesel Based Stimulation Fluids/Compounds section
Voluntary avoidance of diesel in fracs, beyond standard NDIC requirements, indicating environmental or regulatory risk mitigation strategy.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Waste management and cuttings disposal
With permit approved 04/07/2026 and operations commencing post-publication, immediate need for disposal services at spud; pre-selected vendors signal urgent contracting opportunities.
Surveying and anti-collision services
Advanced AC strategy requires real-time surveys and gamma ray tools; with drilling start imminent after approval, service providers should prepare for high-frequency surveying demands.
Regulatory and permitting support
Named NDIC contact (Will Ryan) for notifications; post-approval timing (04/07/2026) creates window for on-site oversight and compliance services.