๐Ÿ›ข๏ธ Parshall 442-0207H

EOG Resources, Inc. ยท Mountrail County, ND ยท File #42818 ยท Generated 2026-04-08 03:32

API
3306105676
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permission requested and implied granted to frac out the toe of the wellbore.
๐Ÿ“„ Completion & Perforation and Drilling Plan
Frac-out of wet shoe is a specific completion technique not universally applied, enabling deeper perforations.
2026-04-07 Completions / Frac
Tier 3 Waiver of 3-business-day waiting period following permit publication, approved specifically for this well only.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations and Operator Assertions
Standard NDIC policy requires 3 business days post-publication before operations; this waiver indicates urgency to commence drilling immediately after approval.
2026-04-07 Regulatory / Permitting
Tier 3 Waiver from NDIC Order 31973 for wellbore entering Bakken Petroleum System outside target DSU, with affidavit provided.
๐Ÿ“„ Waiver Request Letter and Affidavit
Requires specific documentation and waiver for off-DSU entry, revealing non-standard spacing unit configuration.
2026-04-07 Regulatory / Permitting
Tier 3 Request to add a moat to the well pad for snow melt or heavy precipitation, due to wetlands and fiber optic cable constraints.
๐Ÿ“„ Proposed Work section
Non-standard pad modification to accommodate environmental and infrastructure challenges not typical in routine pad designs.
2026-04-07 General Oilfield Services
Tier 3 Affidavit affirming no diesel fuel use in hydraulic fracturing fluids.
๐Ÿ“„ Affidavit in Re Hydraulic Fracture Fluids
Explicit commitment to non-diesel frac fluids, aligning with regulatory or environmental preferences.
2026-02-19 Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and Completion Services
Waiver approval on April 7, 2026, signals immediate opportunity for rig mobilization and frac services, with 60-90 day duration window.
Civil and Environmental Engineering
Pad modifications and moat addition required prior to spud, creating urgent need for site preparation contractors.