โ† Back to Daily Permits

๐Ÿ›ข๏ธ BONANZA 5202 42-21 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท McKenzie County, ND ยท File #42820 ยท Generated 2026-04-09 01:39

API
3305310774
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (10)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner with intentional over-displacement by 7 barrels to create uncemented annulus for toe initiation, allowing pump-down of perforating guns on wireline.
๐Ÿ“„ Page 10, Wet Shoe section
Non-standard cementing technique to enable cost-effective toe initiation without tubing or tractor, differing from typical full cement jobs.
Unknown Completions / Frac
Tier 3 Drill-back notification provided to Continental Resources via email on 1/15/2026 for adjacent spacing unit traversal.
๐Ÿ“„ Page 10, Affidavit Affirming Drill-Back Notification
Formal notification to adjacent operator for wellbore crossing outside target unit, per Order No. 31848.
2026-01-15 General Oilfield Services
Tier 3 Anticipated drilling commencement date: July 15, 2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 10, Anticipated Starting Dates
Specific start date for operations, indicating urgency or planning timeline.
2025-07-15 Drilling Rigs
Tier 3 Closed mud system with no cuttings pit required, emphasizing environmental compliance.
๐Ÿ“„ Page 1, Stipulations
Mandated environmental design choice not always standard in permits, indicating regulatory pressure on fluid management.
Unknown Mud / Fluids
Tier 3 Requirement for CBL on Dakota string prior to running 7" casing.
๐Ÿ“„ Page 1, Stipulations
Specific logging requirement for intermediate casing integrity, beyond basic permit logs.
Unknown General Oilfield Services
Tier 3 Use of indirect heater in lieu of heated treater with NDIC exemption under Case No. 28949 Order No. 31500, set within 60 feet of wellhead and 21 feet of oil tank.
๐Ÿ“„ Page 10, Facility Statement
Non-standard facility design with specific setback exemptions, optimizing pad layout.
Unknown General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Will Ryan prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Stipulations
Named specific inspector, suggesting personalized oversight or prior issues.
Relative General Oilfield Services
Tier 3 Anti-collision measures include AC guidance reporting, real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures, and surveys every 93'-100' increasing as needed.
๐Ÿ“„ Page 10, Anti-Collision Statement
Detailed anti-collision protocol beyond basic permit requirements, indicating high-density field with collision risks.
Unknown Directional Drilling
Tier 3 Operator will use one of listed licensed facilities for dry cuttings disposal, including Chimney Butte Environmental LLC and others.
๐Ÿ“„ Page 10, Licensed Facilities for Solid Drill Cutting Disposal
Pre-selected disposal vendors, ensuring compliance with waste management.
Unknown General Oilfield Services
Tier 3 No diesel-based compounds in hydraulic stimulation fluids, excluding specific CAS numbers.
๐Ÿ“„ Page 10, DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Explicit ban on diesel in stim fluids, aligning with environmental regulations.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Mud system and environmental services
Closed mud system requirement effective immediately upon spud, with filter sock containers needed from spud through flow-back.
Wireline logging and cement evaluation
CBL required on Dakota string prior to 7" casing, timing with intermediate drilling phase.
Surveying and anti-collision services
Real-time surveys every 93'-100' during lateral, increasing frequency near crossings, aligning with drilling timeline starting July 15, 2025.
Stimulation and chemical services
Diesel-free stim fluids mandated, requiring alternative compounds for completion post-drilling.
Waste disposal services
Cuttings disposal to pre-selected facilities during drilling, with haul to closest available.