| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Use of wet shoe with ability to frac out the toe in the production liner, enabling frac operations through the shoe. ๐ COMPLETION & PERFORATION section and PROPOSED WORK section Non-standard completion design allowing toe fracturing, differing from dry shoe setups and indicating advanced frac technology adoption. |
Unknown | Completions / Frac |
| Tier 3 |
Multi-well pad development with five horizontal wells (1H-LL, 2H, 3H, 4H, 5H) from a single pad, requiring sequencing of drilling in standup 1920-acre units before the lease-line 3840-acre unit. ๐ STIPULATIONS section and PROPOSED WORK section Imposes regulatory sequencing constraints not typical for single-well permits, signaling phased development strategy to optimize spacing compliance. |
2026-04-09 | Drilling Rigs |
| Tier 3 |
Backbuild order waiver granted for drilling wells outside the target spacing unit, with Phoenix Energy as the offset operator eliminating need for additional notification. ๐ Letter dated February 5, 2026, SUBJECT: CANDY FERRARI Pad - Backbuild Order Waiver Waiver enables off-spacing drilling, a regulatory accommodation not routinely granted, revealing operator's proactive regulatory strategy. |
2026-02-05 | Regulatory / Permitting |