๐Ÿ›ข๏ธ OPSAL FEDERAL 5799 42-11 2B

Enerplus Resources USA Corporation ยท Williams County, ND ยท File #42837 ยท Generated 2026-04-14 01:57

API
3310506812
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (11)

Tier Signal Date Service Impact
Tier 2 Approval granted with specific setback conditions: 150' north/south and 500' east/west within 2560-acre spacing unit, based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ STIPULATIONS section
Non-standard setback requirements tied to wet shoe design, indicating regulatory approval hinges on specific cementing and fracturing capabilities.
2026-04-13 Completions / Frac
Tier 2 Wet shoe configuration: Liner intentionally over-displaced by 7 barrels, creating ~400' uncemented annulus for economic toe initiation via wireline perforating.
๐Ÿ“„ Wet Shoe section in attachment
Unconventional liner cementing method to reduce costs by avoiding tubing-conveyed perforating.
Unknown Completions / Frac
Tier 3 Closed mud system required, no cuttings pit; conductor set only on permitted wells.
๐Ÿ“„ Conditions of Approval
Environmental compliance mandates closed-loop mud handling, differing from open-pit norms.
2026-04-13 Mud / Fluids
Tier 3 Perimeter berm required surrounding entire location.
๐Ÿ“„ Conditions of Approval
Additional containment measure beyond standard pads.
2026-04-13 General Oilfield Services
Tier 3 Drill-back notification to adjacent operator Kraken Operating LLC on 3/30/2026, including wellbore diagram and commencement date.
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Proactive notification to adjacent spacing unit operator, complying with Order No. 31848.
2026-03-30 General Oilfield Services
Tier 3 Anticipated drilling commencement: June 07, 2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates
Specific start date for operations.
2025-06-07 Drilling Rigs
Tier 3 Notification upon spudding and Sundry Notice filing within 3 business days including drilling contractor and rig details.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval
Post-spud reporting requirements reveal rig and contractor choices.
Relative Drilling Rigs
Tier 3 Mandatory contact with NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval
Pre-construction regulatory oversight required, potentially delaying site prep.
Relative General Oilfield Services
Tier 3 Anti-collision precautions: AC guidance, real-time surveys, 1.2 separation factor, gamma ray signatures, surveys every 93'-100'.
๐Ÿ“„ ANTI-COLLISION STATEMENT
Detailed anti-collision measures beyond standard practices.
Unknown Directional Drilling
Tier 3 Licensed facilities selected for dry cuttings disposal: Closest available from listed options.
๐Ÿ“„ LICENSED FACILITIES FOR SOLID DRILL CUTTINGS DISPOSAL
Pre-selection of disposal vendors for environmental compliance.
Unknown General Oilfield Services
Tier 3 No diesel-based compounds in hydraulic stimulation fluids.
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Compliance with February 12, 2014 memo banning diesel fuels.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Anticipated drilling start June 2025; anti-collision and survey frequency requirements signal immediate need for precise directional services.
Mud and cuttings disposal
Closed mud system and pre-selected disposal facilities indicate ongoing demand during drilling phase starting June 2025.
Wireline and perforating
Wet shoe design for wireline perforating implies opportunity post-liner installation, timed with lateral drilling.
Cementing and fracturing
Setback conditions tied to cemented liner and frac-out capability; relevant during completion phase following drilling.