| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe configuration in production liner to enable wireline perforating of first stage, avoiding more expensive tubing or tractor methods ๐ Page 6, Anti-Collision Statement and Wet Shoe section; Page 10, Wet Shoe details Non-standard liner design to reduce completion costs by facilitating downhole operations without additional equipment |
Unknown | Completions / Frac |
| Tier 3 |
Contact BLM for federal permit confirmation due to spacing unit potentially subject to federal oversightโฐ TIME-SENSITIVE ๐ Email from NDIC to Operator on 4/13/2026 Requirement for additional federal permitting in addition to state, indicating complex regulatory landscape |
2026-04-13 | General Oilfield Services |
| Tier 3 |
Drill-back notification provided to adjacent operator Kraken Operating LLC via email on 3/30/2026, including wellbore diagram and commencement date ๐ Affidavit Affirming Drill-Back Notification Compliance with NDIC Order No. 31848 for horizontal wells traversing adjacent spacing units |
2026-03-30 | General Oilfield Services |
| Tier 3 |
Anticipated drilling commencement on June 7, 2025, with 30 days estimated for drilling and completionโฐ TIME-SENSITIVE ๐ Page 8, Anticipated Starting Dates Specific timeline for operations start, ahead of permit approval date |
2025-06-07 | Drilling Rigs |
| Tier 3 |
Request for waiver on open hole logs, planning only cement bond log from deepest casing point ๐ Page 4, Evaluation Program Deviation from standard porosity and resistivity logging requirements, opting for minimal evaluation |
Unknown | Regulatory / Permitting |
| Tier 3 |
Gamma ray signatures used for anti-collision to identify and avoid existing wellbore paths in target zone ๐ Page 6, Anti-Collision Statement Advanced anti-collision method beyond standard separation factors, enhancing safety in dense spacing |
Unknown | Directional Drilling |