| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval granted with specific setback conditions: 150' north/south and 500' east/west within 2560-acre spacing unit, with production liner cemented in lateral and ability to frac out the shoe. ๐ STIPULATIONS - Conditions of Approval Non-standard setback requirements tied to cementing and frac design, indicating regulatory constraints on wellbore placement. |
2026-04-13 | Completions / Frac |
| Tier 2 |
Wet shoe configuration on 4-1/2" liner: intentionally over-displaced cement by 7 barrels, creating 400' uncemented annulus for toe initiation, allowing pump-down perforating on wireline. ๐ 1.11.1 4-1/2in liner.. and Wet Shoe configuration details Unconventional liner cementing to enable cost-effective toe initiation without tubing or tractor, differing from standard full-cement jobs. |
Relative | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit; conductor set only on permitted wells; contact NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE ๐ Conditions of Approval and Page 2 Mandatory pre-construction contact and environmental controls beyond basic permitting, indicating regulatory oversight on site prep. |
2026-04-13 | Mud / Fluids |
| Tier 3 |
Notification to adjacent operator Kraken Operating LLC via email on 3/30/2026 for drill-back policy, including wellbore diagram and commencement date. ๐ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION Explicit drill-back notification to adjacent unit operator, required under Order No. 31848 for wells entering outside target spacing. |
2026-03-30 | General Oilfield Services |
| Tier 3 |
Anticipated drilling commencement date: June 7, 2025; completion days approximately 30.โฐ TIME-SENSITIVE ๐ 1.8 Anticipated Starting Dates.. Forward-looking schedule for operations, with specific start date and duration. |
2025-06-07 | General Oilfield Services |
| Tier 3 |
No diesel-based compounds in hydraulic stimulation fluids, per NDAC 43-02-03-49 and February 12, 2014 memo. ๐ 1.9 DIESEL BASED STIMULATION FLUIDS/COMPOUNDS and Page 9 Prohibition on diesel in fracs, mandating alternative fluids. |
2014-02-12 | Completions / Frac |
| Tier 3 |
Use of licensed facilities for dry cuttings disposal, listing specific sites like Chimney Butte Environmental LLC and others. ๐ 1.10 Licensed Facilities for Solid Drill Cutting Disposal Pre-selected disposal sites for cuttings, ensuring compliance with waste regulations. |
Unknown | General Oilfield Services |