๐Ÿ›ข๏ธ OPSAL 5799 42-11 4B

Enerplus Resources USA Corporation ยท Williams County, ND ยท File #42839 ยท Generated 2026-04-14 01:58

API
3310506814
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Approval granted with specific setback conditions: 150' north/south and 500' east/west within 2560-acre spacing unit, with production liner cemented in lateral and ability to frac out the shoe.
๐Ÿ“„ STIPULATIONS - Conditions of Approval
Non-standard setback requirements tied to cementing and frac design, indicating regulatory constraints on wellbore placement.
2026-04-13 Completions / Frac
Tier 2 Wet shoe configuration on 4-1/2" liner: intentionally over-displaced cement by 7 barrels, creating 400' uncemented annulus for toe initiation, allowing pump-down perforating on wireline.
๐Ÿ“„ 1.11.1 4-1/2in liner.. and Wet Shoe configuration details
Unconventional liner cementing to enable cost-effective toe initiation without tubing or tractor, differing from standard full-cement jobs.
Relative Completions / Frac
Tier 3 Closed mud system with no cuttings pit; conductor set only on permitted wells; contact NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval and Page 2
Mandatory pre-construction contact and environmental controls beyond basic permitting, indicating regulatory oversight on site prep.
2026-04-13 Mud / Fluids
Tier 3 Notification to adjacent operator Kraken Operating LLC via email on 3/30/2026 for drill-back policy, including wellbore diagram and commencement date.
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Explicit drill-back notification to adjacent unit operator, required under Order No. 31848 for wells entering outside target spacing.
2026-03-30 General Oilfield Services
Tier 3 Anticipated drilling commencement date: June 7, 2025; completion days approximately 30.โฐ TIME-SENSITIVE
๐Ÿ“„ 1.8 Anticipated Starting Dates..
Forward-looking schedule for operations, with specific start date and duration.
2025-06-07 General Oilfield Services
Tier 3 No diesel-based compounds in hydraulic stimulation fluids, per NDAC 43-02-03-49 and February 12, 2014 memo.
๐Ÿ“„ 1.9 DIESEL BASED STIMULATION FLUIDS/COMPOUNDS and Page 9
Prohibition on diesel in fracs, mandating alternative fluids.
2014-02-12 Completions / Frac
Tier 3 Use of licensed facilities for dry cuttings disposal, listing specific sites like Chimney Butte Environmental LLC and others.
๐Ÿ“„ 1.10 Licensed Facilities for Solid Drill Cutting Disposal
Pre-selected disposal sites for cuttings, ensuring compliance with waste regulations.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and anti-collision services
Anti-collision report completed with Total Directional Services; drilling starts June 2025, requiring real-time surveys.
Waste management and cuttings disposal
Pre-selected licensed facilities for dry cuttings; operations commence mid-2025, creating immediate disposal needs.
Wireline perforating and frac services
Wet shoe design enables wireline toe initiation; stimulation planned post-drilling, with diesel prohibition shifting to alternatives.