๐Ÿ›ข๏ธ Parshall 441-0218H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #42840 ยท Generated 2026-04-15 01:30

API
3306105678
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Request to frac out the toe using a wet shoe and burst plug in the production liner
๐Ÿ“„ Page 10 of 11, Toe Assembly section
Design choice for cemented liner with wet shoe allows deepest perforation at TD, differing from dry shoe completions
Unknown Completions / Frac
Tier 3 Waiver of 3-business-day waiting period following permit publication, approved specifically for this well onlyโฐ TIME-SENSITIVE
๐Ÿ“„ Page 8 of 11, PROPOSED WORK section and APPROVED BY section
Standard NDIC rule requires 3-day wait before operations; waiver indicates urgency to commence drilling immediately after approval
2026-04-14 Drilling Rigs
Tier 3 Request for permission to add a moat to the well pad for snow melt or heavy precipitation accommodation
๐Ÿ“„ Page 8 of 11, PROPOSED WORK section
Non-standard pad modification due to site constraints (wetlands and fiber optic cable), separating well and facility pads
2026-04-08 General Oilfield Services
Tier 3 Affidavit affirming no diesel fuel used in hydraulic fracturing fluids
๐Ÿ“„ AFFIDAVIT IN RE HYDRAULIC FRACTURE FLUIDS section
Regulatory compliance assertion tied to EPA definitions, part of permit application for multiple wells
2026-02-19 Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Rig mobilization and drilling services
Waiver approval on 2026-04-14 enables immediate operations, creating urgent opportunity post-permit
Earthwork and pad construction
Moat addition and separate pads required soon after permit, with site constraints necessitating specialized services
Cementing and completion services
Halliburton-specified cement program and toe frac design indicate readiness for intermediate and production phase services upon drilling start