| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Request to frac out the toe using a wet shoe and burst plug in the production liner ๐ Page 10 of 11, Toe Assembly section Design choice for cemented liner with wet shoe allows deepest perforation at TD, differing from dry shoe completions |
Unknown | Completions / Frac |
| Tier 3 |
Waiver of 3-business-day waiting period following permit publication, approved specifically for this well onlyโฐ TIME-SENSITIVE ๐ Page 8 of 11, PROPOSED WORK section and APPROVED BY section Standard NDIC rule requires 3-day wait before operations; waiver indicates urgency to commence drilling immediately after approval |
2026-04-14 | Drilling Rigs |
| Tier 3 |
Request for permission to add a moat to the well pad for snow melt or heavy precipitation accommodation ๐ Page 8 of 11, PROPOSED WORK section Non-standard pad modification due to site constraints (wetlands and fiber optic cable), separating well and facility pads |
2026-04-08 | General Oilfield Services |
| Tier 3 |
Affidavit affirming no diesel fuel used in hydraulic fracturing fluids ๐ AFFIDAVIT IN RE HYDRAULIC FRACTURE FLUIDS section Regulatory compliance assertion tied to EPA definitions, part of permit application for multiple wells |
2026-02-19 | Completions / Frac |