| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe sub with bridge plug isolation for frac stimulation, allowing toe stage injection without ability to frac out the shoe ๐ Page 3 of 10, WELLBORE INFORMATION and PROPOSED WORK Non-standard completion design requiring bridge plug set at toe prior to frac, indicating specific engineering choice for lateral integrity and stimulation sequence |
Unknown | Completions / Frac |
| Tier 3 |
Notification to Hunt Oil Company of drilling plans for adjacent spacing unit under NDIC Order No. 33661โฐ TIME-SENSITIVE ๐ SWORN AFFIDAVIT Formal disclosure of trajectory and plans to competitor operator, required for wells entering Bakken outside target unit |
2026-04-14 | General Oilfield Services |
| Tier 3 |
Anti-collision measures: 200/300 ft setback from active vertical wells, with design reductions in frac size for stages near active wells ๐ PROPOSED WORK Specific proximity protocols beyond standard setbacks, indicating awareness of nearby active wells |
Unknown | Directional Drilling |
| Tier 3 |
Planned frac stimulation of 80 stages, 15MM lbs proppant, and 370M bbls fluid ๐ WELL CONSTRUCTION DIAGRAM High-intensity completion plan exceeding typical Bakken fracs, signaling aggressive development intent |
Relative | Completions / Frac |