โ† Back to Daily Permits

๐Ÿ›ข๏ธ ORCAS STATE 5601 13-4 2B

ENERPLUS RESOURCES USA CORPORATION ยท Williams County, ND ยท File #42842 ยท Generated 2026-04-15 01:31

API
3310506815
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner to enable economic toe initiation via wireline without tubing conveyance
๐Ÿ“„ Page 10 of 10, Wet Shoe section
Non-standard liner cementing practice that over-displaces cement to create uncemented annulus, reducing operational costs for perforating
Unknown Completions / Frac
Tier 3 Anticipated drilling commencement date set for June 7, 2025โฐ TIME-SENSITIVE
๐Ÿ“„ Page 8 of 10, Anticipated Starting Dates
Specific future start date implies urgency in pad preparation and resource allocation
2025-06-07 General Oilfield Services
Tier 3 No diesel-based compounds in hydraulic stimulation fluids, complying with February 12, 2014 memo
๐Ÿ“„ Page 8 of 10, DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Adherence to regulatory ban on diesel, using alternative fluids
2014-02-12 General Oilfield Services
Tier 3 Waiver requested for logging requirements under NDAC 43-02-03-49
๐Ÿ“„ Page 9 of 10, Assertions section
Deviation from standard porosity and resistivity logging, potentially to expedite operations
Unknown Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Wireline and perforating services
Wet shoe enables wireline toe initiation; opportunity arises with drilling start in June 2025
Waste disposal and environmental services
Pre-selected licensed facilities for cuttings; timing with anticipated 30-day drilling period
Surveying and engineering
Named surveyor and engineer for pad design; relevance during pre-drilling construction phase