| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe configuration on production liner to enable economic toe initiation via wireline without tubing conveyance ๐ Page 10 of 10, Wet Shoe section Non-standard liner cementing practice that over-displaces cement to create uncemented annulus, reducing operational costs for perforating |
Unknown | Completions / Frac |
| Tier 3 |
Anticipated drilling commencement date set for June 7, 2025โฐ TIME-SENSITIVE ๐ Page 8 of 10, Anticipated Starting Dates Specific future start date implies urgency in pad preparation and resource allocation |
2025-06-07 | General Oilfield Services |
| Tier 3 |
No diesel-based compounds in hydraulic stimulation fluids, complying with February 12, 2014 memo ๐ Page 8 of 10, DIESEL BASED STIMULATION FLUIDS/COMPOUNDS Adherence to regulatory ban on diesel, using alternative fluids |
2014-02-12 | General Oilfield Services |
| Tier 3 |
Waiver requested for logging requirements under NDAC 43-02-03-49 ๐ Page 9 of 10, Assertions section Deviation from standard porosity and resistivity logging, potentially to expedite operations |
Unknown | Regulatory / Permitting |