๐Ÿ›ข๏ธ ROOSEVELT FEDERAL 5003 13-24 4B

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #42844 ยท Generated 2026-04-16 01:47

API
3305310785
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration: intentional over-displacement by 7 barrels to create uncemented annulus for toe initiation.
๐Ÿ“„ Wet Shoe section in attachments
Non-traditional cementing method to enable wireline perforating without tubing, avoiding more expensive options.
Unknown Completions / Frac
Tier 3 Requirement for CBL on 9-5/8-inch intermediate casing prior to setting 7-inch casing.
๐Ÿ“„ Page 2, Construction Commencement Notification
Mandatory cement bond log on intermediate string, not always required in standard permits.
2026-04-15 General Oilfield Services
Tier 3 Approval granted with specific setback conditions: 150' north/south, 1220' east/west within 1920-acre spacing unit.
๐Ÿ“„ STIPULATIONS section
Non-standard setback distances for lateral isolation, indicating regulatory constraints on wellbore placement.
2026-04-15 General Oilfield Services
Tier 3 Waiver requested for drill-back notification as operator controls adjacent spacing unit.
๐Ÿ“„ Letter dated March 24, 2026
Self-waiver for notification, implying operator dominance in area and reduced external coordination needs.
2026-03-24 Regulatory / Permitting
Tier 3 Anticipated drilling commencement: July 15, 2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates
Specific start date provided, despite permit approval in 2026, suggesting pre-planning or error.
2025-07-15 Drilling Rigs
Tier 3 Anti-collision measures include real-time corrected surveys, 1.2 separation safety factor, and gamma ray signatures.
๐Ÿ“„ ANTI-COLLISION STATEMENT
Detailed anti-collision protocol beyond basic requirements, indicating high well density concerns.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and surveying services
Anti-collision protocols and specific start date imply immediate need for MWD and directional drilling expertise.
Cementing and logging
Mandatory CBL and wet shoe cementing require specialized cement services and logging tools post-approval.