โ† Back to Daily Permits

๐Ÿ›ข๏ธ ROOSEVELT FEDERAL 5003 13-24 5B

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #42845 ยท Generated 2026-04-16 01:47

API
3305310786
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Waiver requested for drill-back notification under Order No. 31848 because operator controls adjacent spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Tuesday, March 24, 2026 letter
Self-waiver for regulatory notification, uncommon unless operator has full control.
2026-03-24 Regulatory / Permitting
Tier 3 Anti-collision report identifies multiple nearby wells with separation factors, including Level 3 warnings.
๐Ÿ“„ Anticollision Report dated 09 March, 2026
Detailed proximity analysis with warnings, indicating high-risk drilling environment.
2026-03-09 Directional Drilling
Tier 3 Wet shoe configuration on production liner to enable frac out the shoe for toe initiation, avoiding more expensive perforating methods.
๐Ÿ“„ Page 9 of 10, Facility Construction Statement
Non-standard liner design choice to reduce completion costs in horizontal drilling.
Unknown Completions / Frac
Tier 3 Indirect heater used in facility design with NDIC exemption under Case No. 28949 Order No. 31500, allowing closer setback to wellhead.
๐Ÿ“„ Page 9 of 10, Facility Statement
Regulatory exemption for compact facility layout, not routine for heated treaters.
Unknown General Oilfield Services
Tier 3 No diesel-based compounds in hydraulic stimulation fluids, explicitly excluding CAS registry numbers.
๐Ÿ“„ Page 9 of 10, DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Proactive environmental compliance choice beyond standard requirements.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Anticipated drilling start July 15, 2025, with specific survey frequency and anti-collision requirements creating immediate need for precise services.
Completion and stimulation
Wet shoe design and no-diesel stim policy signal specialized frac and liner services required post-drilling, with 30 days estimated for completion.
Waste disposal and environmental
Pre-selected licensed facilities for cuttings disposal, with leak-proof containers required from spud, indicating ongoing need during operations.