| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit approval granted with specific setback requirements (150' north/south, 500' east/west) within 2560-acre spacing unit, including wet shoe for frac out and ability to consolidate production equipment at central location. ๐ STIPULATIONS section, Page 1-2 Reveals operator's intent to drill in a constrained spacing unit with non-standard cementing (wet shoe) to enable efficient frac operations, differing from typical dry shoe setups. |
2026-04-15 | Completions / Frac |
| Tier 2 |
Wet shoe configuration detailed: liner over-displaced by 7 barrels, creating 400' uncemented annulus for toe initiation, avoiding expensive tubing-conveyed perforating. ๐ Wet Shoe section, Page 11-12 Non-standard cementing technique signals cost-saving intent in completion design, not typical in all Bakken horizontals. |
Relative | Completions / Frac |
| Tier 3 |
Anticipated drilling commencement date specified, with waiver requested for drill-back notification as operator controls adjacent spacing unit.โฐ TIME-SENSITIVE ๐ Anticipated Starting Dates section, Page 8; Letter dated April 13, 2026 Early disclosure of start date and self-waiver indicates operator's control over adjacent acreage, reducing regulatory delays. |
2025-06-07 | Drilling Rigs |
| Tier 3 |
Operator commits to no diesel-based stimulation fluids, listing prohibited CAS numbers. ๐ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS section, Page 9 Explicit avoidance of diesel indicates regulatory compliance focus and potential use of alternative frac fluids, differing from some operators' practices. |
Unknown | Completions / Frac |