๐Ÿ›ข๏ธ ORCAS STATE 5601 13-4 4B

ENERPLUS RESOURCES USA CORPORATION ยท Williams County, ND ยท File #42847 ยท Generated 2026-04-16 01:48

API
3310506817
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Permit approval granted with specific setback requirements (150' north/south, 500' east/west) within 2560-acre spacing unit, including wet shoe for frac out and ability to consolidate production equipment at central location.
๐Ÿ“„ STIPULATIONS section, Page 1-2
Reveals operator's intent to drill in a constrained spacing unit with non-standard cementing (wet shoe) to enable efficient frac operations, differing from typical dry shoe setups.
2026-04-15 Completions / Frac
Tier 2 Wet shoe configuration detailed: liner over-displaced by 7 barrels, creating 400' uncemented annulus for toe initiation, avoiding expensive tubing-conveyed perforating.
๐Ÿ“„ Wet Shoe section, Page 11-12
Non-standard cementing technique signals cost-saving intent in completion design, not typical in all Bakken horizontals.
Relative Completions / Frac
Tier 3 Anticipated drilling commencement date specified, with waiver requested for drill-back notification as operator controls adjacent spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates section, Page 8; Letter dated April 13, 2026
Early disclosure of start date and self-waiver indicates operator's control over adjacent acreage, reducing regulatory delays.
2025-06-07 Drilling Rigs
Tier 3 Operator commits to no diesel-based stimulation fluids, listing prohibited CAS numbers.
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS section, Page 9
Explicit avoidance of diesel indicates regulatory compliance focus and potential use of alternative frac fluids, differing from some operators' practices.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and completion services (rig mobilization, cementing, perforating)
Anticipated drilling start June 7, 2025, creates immediate opportunity for rig and crew availability; wet shoe design signals need for specialized liner cementing expertise.
Waste management and disposal
Pre-selected licensed facilities indicate readiness for cuttings disposal upon spud; proximity to Williston suggests short-haul logistics preferred.
Regulatory and surveying services
Recent survey dated March 17, 2026, and approval April 15, 2026, imply ongoing need for updates; contact with NDIC Inspector signals pre-construction coordination window.