๐Ÿ›ข๏ธ JAFFA 5303 14-1 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42849 ยท Generated 2026-04-23 03:31

API
3310506819
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner, intentionally over-displaced by 7 barrels to create uncemented annulus for toe initiation.
๐Ÿ“„ 4-1/2in liner section and Wet Shoe discussion
Allows pump-down perforating on wireline, avoiding more expensive tubing-conveyed methods, indicating cost-optimization intent in completion design.
Unknown Completions / Frac
Tier 3 Drill-back notification provided to adjacent operator Devon Energy via email on 2/11/2026, including wellbore diagram and commencement date.โฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION section
Mandatory notification for wells entering Bakken outside target spacing unit, per Order No. 31848, signaling potential for offset activity or disputes.
2026-02-11 Directional Drilling
Tier 3 Anticipated drilling commencement on July 15, 2025, with operations lasting approximately 30 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates section
Specific timeline for spudding, not inferred from permit alone, indicating urgency or seasonal planning.
2025-07-15 Mud / Fluids
Tier 3 Use of indirect heater with 60-foot setback exemption under NDIC Case No. 28949 Order No. 31500, placed within 21 feet of oil tank.
๐Ÿ“„ FACILITY STATEMENT section
Non-standard facility placement leveraging prior regulatory approval, reducing pad footprint compared to typical 150-foot setbacks.
Unknown General Oilfield Services
Tier 3 Requirement for CBL run on 9-5/8" Dakota string prior to running 7" casing.
๐Ÿ“„ STIPULATIONS section
Mandatory cement bond log on intermediate string, a non-routine QA/QC step beyond basic permit data, suggesting past issues or heightened scrutiny in the area.
Unknown General Oilfield Services
Tier 3 Anti-collision precautions include AC guidance reporting, real-time corrected surveys, 1.2 separation safety factor, gamma ray signatures, and 93-100' survey frequency.
๐Ÿ“„ ANTI-COLLISION STATEMENT section
Detailed, non-routine anti-collision protocol, suggesting high well density or past incidents in the area.
Unknown Directional Drilling
Tier 3 Approval granted pursuant to Commission Order No. 35054 with specific setback conditions for wellbore isolation in 2560-acre spacing unit.
๐Ÿ“„ STIPULATIONS section
Non-standard setback requirements (150' north/south, 500' east/west) within defined spacing unit, indicating regulatory-driven design constraints not typical for all permits.
Unknown General Oilfield Services
Tier 3 Operator commits to no diesel-based stimulation fluids, excluding specific CAS registry numbers.
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS section
Explicit avoidance of diesel in frac fluids, a regulatory or environmental choice beyond standard practices.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Anticipated spud on 2025-07-15 with detailed anti-collision requirements; immediate opportunity for real-time surveys and gamma ray logging in high-density area.
Cementing and evaluation
CBL requirement on Dakota string and wet shoe design; pre-drilling window to bid on specialized cement jobs and bond logging services.
Waste disposal
Listed facilities for cuttings; operators can secure contracts ahead of operations starting mid-2025, capitalizing on proximity preferences.
Completion and stimulation
No diesel fluids and indirect heater setup; opportunity to provide eco-friendly additives and heater installation services around July 2025 timeline.