๐Ÿ›ข๏ธ JAFFA 5303 14-1 4B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42850 ยท Generated 2026-04-23 03:32

API
3310506820
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner with intentional over-displacement of cement by 7 barrels to create uncemented annulus for economic toe initiation and wireline perforating.
๐Ÿ“„ Page 6 of 10, Wet Shoe section in attachment 6
Non-standard cementing practice enabling cost-effective completion without tubing or tractor, differing from typical full cement isolation.
Unknown Completions / Frac
Tier 3 Notification to adjacent operator (Devon Energy) via email on 2/11/2026 for drill-back policy compliance, including wellbore diagram and commencement date.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Timely compliance action for horizontal drilling outside spacing unit, with specific documentation provided.
2026-02-11 Completions / Frac
Tier 3 Anticipated drilling commencement date of July 15, 2025, with approximately 30 days for drilling and completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Attachment 6, Anticipated Starting Dates
Forward-looking schedule for operations, not standard in permits, indicating planned urgency.
2025-07-15 Drilling Rigs
Tier 3 Use of indirect heater with NDIC exemption (Case No. 28949 Order No. 31500) allowing placement within 60 feet of wellhead and 21 feet of oil tank.
๐Ÿ“„ Attachment 6, Facility Statement
Special regulatory exemption for facility design, enabling closer equipment placement for efficiency.
Unknown General Oilfield Services
Tier 3 Requirement for CBL run on 9-5/8" Dakota string prior to running 7" casing, with waiver request option.
๐Ÿ“„ Page 2 of 10, Conditions of Approval
Mandatory cement evaluation log not always required in standard permits, indicating regulatory emphasis on intermediate casing integrity.
Unknown Regulatory / Permitting
Tier 3 Anti-collision precautions including AC guidance, real-time corrected surveys, 1.2 separation safety factor, and gamma ray signatures for lateral path identification.
๐Ÿ“„ Attachment 6, Anti-Collision Statement
Detailed, multi-method anti-collision strategy beyond basic proximity checks, reflecting high-risk pad environment with multiple nearby wells.
Unknown Directional Drilling
Tier 3 Pre-selected licensed facilities for solid drill cuttings disposal, including Chimney Butte Environmental LLC, Dishon Disposal Inc, and others, with haul to closest available.
๐Ÿ“„ Attachment 6, Licensed Facilities for Solid Drill Cutting Disposal
Explicit vendor selection for waste disposal, not routine in permits, indicating pre-arranged logistics in a regulated area.
Unknown General Oilfield Services
Tier 3 Commitment to no diesel-based compounds in hydraulic stimulation fluids, excluding specific CAS numbers.
๐Ÿ“„ Attachment 6, DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Voluntary environmental restriction on fracking fluids, stricter than minimum requirements, signaling sustainability focus.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
Anticipated drilling start July 15, 2025, with emphasis on real-time surveys and anti-collision tools, creating immediate demand for advanced drilling technologies.
Waste disposal and environmental services
Pre-selected cuttings disposal facilities indicate readiness for operations, with haul-to-closest strategy favoring local providers post-spud.
Cementing and logging services
Mandatory CBL on intermediate casing and wet shoe cementing require specialized cement evaluation and placement services during drilling phase.
Completion and stimulation services
No-diesel fluid commitment and wet shoe for perforating signal need for compliant frac fluids and wireline services around completion start.