๐Ÿ›ข๏ธ JAFFA FEDERAL 5303 14-1 5BX

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42851 ยท Generated 2026-04-23 03:32

API
3310506821
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner allows intentional over-displacement of cement by 7 barrels, creating uncemented annulus for frac out the shoe and enabling wireline perforating to avoid more expensive tubing or tractor methods.
๐Ÿ“„ Page 10 of 10, Wet Shoe section
Non-standard liner cementing technique for economic toe initiation in horizontal completions, not typical in routine permits.
Unknown Completions / Frac
Tier 3 NDIC notification to operator about potential federal permit requirement for spacing unit, requiring contact with BLM office in Dickinson.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated 4/16/2026
Late-stage regulatory flag for federal involvement, not evident from initial permit data.
2026-04-16 General Oilfield Services
Tier 3 Drill-back notification provided to adjacent operator Devon Energy via email, including wellbore diagram, commencement date, and contact info, pursuant to Order No. 31848.โฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Proactive inter-operator coordination for wells entering adjacent spacing units, required but not always detailed in permits.
2026-02-11 Completions / Frac
Tier 3 Indirect heater used in lieu of heated treater with setback exemption under NDIC Case No. 28949 Order No. 31500, allowing placement within 60 feet of wellhead and 21 feet of oil tank.
๐Ÿ“„ Facility Statement
Regulatory exemption for facility design, enabling tighter spacing and potentially faster pad development.
Unknown General Oilfield Services
Tier 3 Anti-collision strategy includes gamma ray signatures to identify and path around existing wellbore locations in target zone, beyond standard separation factors.
๐Ÿ“„ Anti-Collision Statement
Advanced geophysical method for collision avoidance, indicating high-density field development challenges.
Unknown Directional Drilling
Tier 3 Operator commits to no diesel-based compounds in hydraulic stimulation fluids, avoiding specified CAS registry numbers.
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Environmental compliance choice in stimulation design, potentially influencing fluid supplier selection.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and logging
Anticipated drilling start July 15, 2025, with emphasis on gamma ray logging for anti-collision in crowded field.
Completion and stimulation
Wet shoe design and no-diesel fluids signal specialized services needed post-drilling, with 30-day completion window.
Waste disposal and environmental
Pre-spud requirement for filter sock containers and licensed cuttings disposal, urgent before operations commence.
Regulatory and surveying
BLM coordination flagged post-approval, and surveying completed November 2025, indicating immediate follow-up needed.