๐Ÿ›ข๏ธ KANDIYOHI 159-90-6-13H 1

Hunt Oil Company ยท Burke County, ND ยท File #42857 ยท Generated 2026-04-29 02:33

API
3301302027
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wellbore must be located within 500' drilling corridor and no closer than 150' setback from north-south boundaries, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Commission Order No. 34862 Stipulations
Non-standard setback design tied to wet shoe completion, exposing intent for frac-out capability and precise spacing to maximize recovery in 3840-acre unit.
4/22/2026 Completions / Frac
Tier 3 Confirmation of no diesel fuel use in hydraulic fracture stimulation, per February 12, 2014 memo.
๐Ÿ“„ Statement Regarding Hydraulic Fracture Stimulation
Explicit avoidance of diesel, revealing environmental intent and preference for alternative frac fluids.
3/31/2026 Completions / Frac
Tier 3 Closed mud system with no cuttings pit, remote or automatic shutoff devices required, and all cuttings hauled to approved facility.
๐Ÿ“„ Permit Stipulations
Environmental compliance choices indicate operator intent for low-impact operations, differing from open-pit norms and reducing liability.
Unknown Mud / Fluids
Tier 3 Operator must file Sundry Notice within 3 business days of spudding with drilling contractor, rig number, and representative details.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
Reveals post-spud reporting urgency, exposing drilling contractor selection and rig mobilization timeline not in basic data.
Relative Drilling Rigs
Tier 3 Hydraulic fracture stimulation notice required 21-31 days prior to adjacent operators within 2640' of completion intervals, including 24-hour contact info.โฐ TIME-SENSITIVE
๐Ÿ“„ Operator Assertions
Proactive frac scheduling intent, indicating potential for multi-well pad fracs and inter-operator coordination.
Relative Completions / Frac
Tier 3 Requirement to contact NDIC Field Inspector Jason Hicks at 701-720-3523 prior to location construction, with conductor set on permitted wells only.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
Indicates pre-construction coordination intent and potential delay if not complied with, revealing operator's regulatory diligence ahead of competitors.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Permit approved 4/22/2026; construction can commence after 3rd business day, creating immediate need for KLJ and Scientific Drilling services to stake and plan ahead of spudding.
Mud logging and cuttings handling
Closed mud system and cuttings hauling to approved facility required; with spud notification soon, operators can bid for waste management in Thompson Lake field.
Hydraulic fracturing
Frac notice window 21-31 days post-completion; wet shoe design signals frac-out capability, urging vendors to prepare water-based frac services post-drilling.