โ† Back to Daily Permits

๐Ÿ›ข๏ธ GO-Daniel-156-98-0322H-3

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #42860 ยท Generated 2026-04-29 02:35

API
3310506823
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Casing program includes wet shoe sub for intentional over-displacement and plug-and-perf completion method.
๐Ÿ“„ Casing and Cement Program
Non-routine completion technique allowing frac-out through shoe and subsequent plug-and-perf stages.
Relative Completions / Frac
Tier 3 Permit approved with conditions including contact to NDIC Field Inspector prior to pad expansion and specific setback requirements.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Approval
Requires pre-spud coordination, indicating urgency in regulatory compliance for pad development.
2026-04-24 General Oilfield Services
Tier 3 Permit application submitted with specific anti-collision precautions including real-time corrected surveys, gamma ray geo-steering, and surveys every 93'-100' with frequency increases as needed.
๐Ÿ“„ Permit application and anti-collision report
Indicates proactive risk management for wellbore collision avoidance in a densely drilled area, beyond standard permit requirements.
2026-04-21 Directional Drilling
Tier 3 Affidavit confirming Halliburton Energy Services does not use specified diesel fuels in hydraulic fracturing, covering all Hess Bakken wells.
๐Ÿ“„ Hydraulic Fracturing Diesel Fuels Affidavit
Demonstrates compliance with February 12, 2014 memo and pre-selects Halliburton as stimulation provider, avoiding regulatory penalties.
2026-04-21 Completions / Frac
Tier 3 Drilling prognosis specifies Nabors X27 rig, closed mud system, remote/automatic shutoff devices, and specific mud program with oil base mud from 2,250ft to 11,141ft.
๐Ÿ“„ Drilling Prognosis
Details non-standard mud system and rig selection, indicating environmental and operational preferences.
Relative Mud / Fluids
Tier 3 Pressure control equipment specifies Cameron Annular Preventer, MI-SWACO Remote Operated Hydraulic Choke, and Shaffer Pipe Ram.
๐Ÿ“„ Pressure Control Equipment
Pre-selection of specific BOP components indicates vendor ecosystem preference for high-reliability equipment.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Anti-Collision Services
Permit approved April 24, 2026, with spud notification required within 3 business days; signals immediate need for real-time surveying and geo-steering.
Completion and Stimulation Services
Post-drilling, with plug-and-perf method and Halliburton stimulation; timing tied to drilling completion.
Pressure Control and Rig Services
Rig mobilization with Nabors X27 and BOP setup required prior to spud.