| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval granted on condition of west setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Stipulations section Non-standard setback design enabling frac-out capability, indicating advanced completion strategy |
2026-04-28 | Completions / Frac |
| Tier 3 |
Wet shoe sub with ability to frac out the toe ๐ Proposed Drilling Plan section Specific liner design for toe fracturing, non-routine for Bakken horizontals |
2026-04-28 | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit required ๐ Stipulations section Mandated environmental control measure beyond basic drilling |
2026-04-28 | Mud / Fluids |
| Tier 3 |
Drill cuttings disposal to IHD Solids Management at 14070 43rd Street NW Alexander, ND 58831 ๐ Disposal of Drill Cuttings section Pre-selected licensed disposal facility |
2026-04-28 | General Oilfield Services |
| Tier 3 |
Facilities off-site, plan to flowline to Albert North pad in NE SE of S27-T151-R102W ๐ Proposed Work section Off-pad production setup for multi-well pad efficiency |
2026-04-28 | General Oilfield Services |
| Tier 3 |
No diesel-based compounds in hydraulic stimulation ๐ Stimulation section Regulatory compliance choice avoiding specific CAS numbers |
2026-04-28 | Completions / Frac |