๐Ÿ›ข๏ธ ALBERT NORTH 27-28-29 2H

DEVON ENERGY WILLISTON, L.L.C. ยท McKenzie County, ND ยท File #42879 ยท Generated 2026-05-04 01:55

API
3305310792
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Approval conditioned on production liner cemented in lateral with wet shoe and ability to frac out the shoe, enabling reduced west setback.
๐Ÿ“„ Stipulations section, Conditions of Approval
Non-standard setback reduction tied to specific completion design, revealing intent for lateral isolation and stimulation strategy.
2026-04-28 Completions / Frac
Tier 3 Requirement for closed mud system with no cuttings pit and disposal to IHD Solids Management.
๐Ÿ“„ Stipulations and Disposal of Drill Cuttings section
Mandated environmental control beyond basic permits, indicating regulatory pressure on waste management.
2026-04-28 Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Will Ryan prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Specific inspector assignment suggests personalized oversight, potentially due to past issues or high-profile pad.
2026-04-28 General Oilfield Services
Tier 3 No diesel-based compounds in hydraulic stimulation, per listed CAS numbers.
๐Ÿ“„ Stimulation section
Explicit ban on diesel reflects heightened environmental scrutiny, deviating from some operators' practices.
2026-04-28 Completions / Frac
Tier 3 Mud program specifies fresh water, 70/30 invert with hi-vis sweeps, and brine water transitions.
๐Ÿ“„ Mud Program section
Detailed mud type progression indicates tailored drilling strategy for Bakken, avoiding routine water-based mud.
2026-04-28 Mud / Fluids
Tier 3 Surface use agreement executed for off-spacing wells, with affidavit dated 12/16/2025.
๐Ÿ“„ Affidavit of Surface Damage Agreement
Off-spacing approval via landowner agreement indicates strategic pad development for multiple horizontals.
2025-12-16 General Oilfield Services
Tier 3 Sundry Notice required within 3 business days of spudding, including drilling contractor and rig details.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Urgent post-spud reporting reveals operational transparency requirements, exposing rig contractor choice.
Relative Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Mud and cuttings management
Closed-loop system and IHD disposal required immediately upon spud, signaling urgent need for invert mud suppliers and disposal logistics.
Completion and stimulation
Wet shoe with frac-out capability implies post-drill stimulation services, with no diesel compounds restricting fluid options.
Regulatory and surveying
Pre-construction contact with specific NDIC inspector and plat certification (dated 5/15/2015, but context 2025) indicate timing for land surveying and permitting services.