| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditioned on production liner cemented in lateral with wet shoe and ability to frac out the shoe to meet west setback requirements. ๐ Page 1, Stipulations Non-standard cementing and shoe design to enable hydraulic fracturing from the toe, allowing tighter spacing and potentially accelerating completion operations. |
2026-04-29 | Completions / Frac |
| Tier 3 |
Requirement for closed mud system with no cuttings pit and disposal via licensed facility. ๐ Page 1, Stipulations; Page 4, Disposal of Drill Cuttings Mandates environmental compliance through closed-loop drilling, avoiding traditional pits and requiring off-site hauling. |
2026-04-29 | Mud / Fluids |
| Tier 3 |
Prohibition on diesel-based compounds in hydraulic stimulation, listing specific CAS numbers. ๐ Page 4, Stimulation Regulatory restriction on stimulation fluids, forcing use of alternative chemistries. |
2026-04-29 | Completions / Frac |
| Tier 3 |
Surface use agreement executed for off-spacing wells from a single pad location. ๐ Affidavit of Surface Damage Agreement Enables multi-well pad development outside standard spacing units, requiring landowner consent. |
2025-12-16 | General Oilfield Services |