โ† Back to Daily Permits

๐Ÿ›ข๏ธ ALBERT SOUTH 34-33-32 4H

DEVON ENERGY WILLISTON, L.L.C. ยท McKenzie County, ND ยท File #42884 ยท Generated 2026-05-13 02:17

API
3305310796
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 West setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe, allowing closer proximity to boundary.
๐Ÿ“„ Stipulations section, Page 1
Non-standard setback design leveraging wet shoe for fracing, potentially enabling tighter spacing or cost savings in lateral placement not typical in basic permits.
Unknown Completions / Frac
Tier 3 Closed mud system with no cuttings pit; drill cuttings hauled to IHD Solids Management for disposal.
๐Ÿ“„ Stipulations section, Page 1; Drilling Operations section
Mandated environmental control beyond basic drilling, indicating regulatory pressure for zero-discharge; pre-selects specific disposal vendor.
Unknown Mud / Fluids
Tier 3 Acknowledgment to provide 21-31 day written notice to operators of wells within 2640 feet of completion intervals.โฐ TIME-SENSITIVE
๐Ÿ“„ Operator Assertions section, Page 6
Proactive anti-collision and notification protocol, revealing operator's awareness of dense development risks.
Unknown Directional Drilling
Tier 3 Permit approved with specific cement additives (e.g., Type III, 6% Salt, 2% Calseal) and volumes for surface, intermediate, and production casing.
๐Ÿ“„ Proposed Cementing Program section
Detailed, non-routine cement formulations tailored to formations, beyond generic casing specs.
Unknown General Oilfield Services
Tier 3 Facilities off-site; plan to flowline to Albert North pad in NE SE of S27-T151-R102W.
๐Ÿ“„ Proposed Work section, Page 6
Off-pad production setup, suggesting pad consolidation or shared infrastructure, not standard for single-well permits.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental and disposal services
Closed-loop mud system and cuttings disposal to IHD required immediately upon spud; signals persistent demand for compliant waste management in Bakken.
Directional drilling and surveying
Specific azimuth-based coordinates and survey frequency (100' vertical, 30' curve, 90' lateral) mandate precise tools; timing tied to spud and completion phases for urgent deployment.
Cementing and casing services
Detailed cement programs with additives for each casing string; opportunity post-spud for specialized formulations to meet compressive strength timelines.