| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
West setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe, allowing closer proximity to boundary. ๐ Stipulations section, Page 1 Non-standard setback design leveraging wet shoe for fracing, potentially enabling tighter spacing or cost savings in lateral placement not typical in basic permits. |
Unknown | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit; drill cuttings hauled to IHD Solids Management for disposal. ๐ Stipulations section, Page 1; Drilling Operations section Mandated environmental control beyond basic drilling, indicating regulatory pressure for zero-discharge; pre-selects specific disposal vendor. |
Unknown | Mud / Fluids |
| Tier 3 |
Acknowledgment to provide 21-31 day written notice to operators of wells within 2640 feet of completion intervals.โฐ TIME-SENSITIVE ๐ Operator Assertions section, Page 6 Proactive anti-collision and notification protocol, revealing operator's awareness of dense development risks. |
Unknown | Directional Drilling |
| Tier 3 |
Permit approved with specific cement additives (e.g., Type III, 6% Salt, 2% Calseal) and volumes for surface, intermediate, and production casing. ๐ Proposed Cementing Program section Detailed, non-routine cement formulations tailored to formations, beyond generic casing specs. |
Unknown | General Oilfield Services |
| Tier 3 |
Facilities off-site; plan to flowline to Albert North pad in NE SE of S27-T151-R102W. ๐ Proposed Work section, Page 6 Off-pad production setup, suggesting pad consolidation or shared infrastructure, not standard for single-well permits. |
Unknown | General Oilfield Services |