| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator will utilize wet shoe with ability to frac out the toe. ๐ STIMULATION section and casing details Specific toe preparation for stimulation, beyond standard liner design. |
2026-04-30 | Completions / Frac |
| Tier 3 |
Approval conditioned on production liner cemented in lateral with wet shoe and ability to frac out the shoe, enabling reduced west setback. ๐ Stipulations section Non-standard setback reduction tied to specific completion design, not typical for all permits. |
2026-04-30 | Completions / Frac |
| Tier 3 |
Drill cuttings disposal to IHD Solids Management at 14070 43rd Street NW, Alexander, ND.โฐ TIME-SENSITIVE ๐ DISPOSAL OF DRILL CUTTINGS section |
2026-04-30 | General Oilfield Services |
| Tier 3 |
Facilities to be off-site with flowline to Albert North pad in NE SE of S27-T151-R102W. ๐ PROPOSED WORK section Off-pad production setup, deviating from on-pad norms for multi-well pads. |
2026-04-30 | General Oilfield Services |