๐Ÿ›ข๏ธ ROOSEVELT FEDERAL 5003 13-24 2BX

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #42886 ยท Generated 2026-05-04 01:56

API
3305310798
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Anticipated drilling commencement date of July 15, 2025โฐ TIME-SENSITIVE
๐Ÿ“„ Page 8 of 10, Anticipated Starting Dates
Commencement planned prior to permit approval date, indicating forward planning or urgency
2025-07-15 General Oilfield Services
Tier 3 Wet shoe configuration on production liner to enable frac out the shoe for toe initiation
๐Ÿ“„ Page 2 of 10, Stipulations
Non-standard liner setup allowing economic toe initiation without tubing or tractor
Unknown Completions / Frac
Tier 3 Detailed anti-collision precautions including real-time corrected surveys, 1.2 separation factor, and gamma ray signatures
๐Ÿ“„ Attachment, Anti-Collision Statement
Advanced methods beyond basic anti-collision in a dense field with multiple nearby wells
Unknown Directional Drilling
Tier 3 Requirement to contact specific NDIC Field Inspector Will Ryan prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10
Specifies a named individual for pre-construction approval, suggesting personalized regulatory oversight
Unknown General Oilfield Services
Tier 3 Waiver for logging to be requested via separate sundry notice
๐Ÿ“„ Page 4 of 10, Proposed Logs
Potential deviation from standard porosity and resistivity logging requirements
Unknown Regulatory / Permitting
Tier 3 Explicit commitment to no diesel-based stimulation fluids
๐Ÿ“„ Page 9 of 10, DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Avoids specific CAS registry numbers for diesel compounds, likely for environmental compliance
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying services
Anticipated start July 2025 requires high-precision anti-collision tools and real-time surveys in dense field
Waste disposal and environmental services
Pre-selected licensed facilities for cuttings disposal, with operations starting July 2025 needing immediate capacity
Completion and stimulation services
Wet shoe design signals need for specialized frac services around toe initiation post-spud