| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit expires if well not completed as SWD by April 30, 2027โฐ TIME-SENSITIVE ๐ Page 3 of 10, Date: 4/30/2026 Imposes a strict deadline for completion, differing from standard indefinite permits |
2027-04-30 | Drilling Rigs |
| Tier 3 |
Tank diking variance approved contingent on as-built schematic submission ๐ Page 3 of 10, Date: 4/30/2026 Non-standard containment design requiring post-construction documentation |
2026-04-30 | General Oilfield Services |
| Tier 3 |
Waiver requested for logs unless otherwise approved ๐ Geologic Information, PROPOSED LOGS Deviation from standard logging requirements |
Unknown | Regulatory / Permitting |
| Tier 3 |
Specific injection pipeline pressure test to 100 psi over permitted pressure required prior to injection ๐ Page 2 of 10, Date: 4/30/2026 Enhanced testing protocol beyond basic permit data |
Relative | General Oilfield Services |
| Tier 3 |
SCADA monitoring with real-time alarms for tanks, separators, and flow rates ๐ UIC Plan, Page 8 Advanced automation and monitoring setup |
Relative | General Oilfield Services |
| Tier 3 |
Facility co-located with planned oil wells on same pad, no third-party volumes planned initially ๐ UIC Plan, Page 6 Integrated pad design for multiple wells, limiting initial scope to on-pad production |
Unknown | General Oilfield Services |