๐Ÿ›ข๏ธ GINA FERRARI 1 SWD

Phoenix Operating LLC ยท Divide County, ND ยท File #42888 ยท Generated 2026-05-01 02:21

API
3302301799
Target Formation
Dakota Group
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Permit expires if well not completed as SWD by April 30, 2027โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, Date: 4/30/2026
Imposes a strict deadline for completion, differing from standard indefinite permits
2027-04-30 Drilling Rigs
Tier 3 Tank diking variance approved contingent on as-built schematic submission
๐Ÿ“„ Page 3 of 10, Date: 4/30/2026
Non-standard containment design requiring post-construction documentation
2026-04-30 General Oilfield Services
Tier 3 Waiver requested for logs unless otherwise approved
๐Ÿ“„ Geologic Information, PROPOSED LOGS
Deviation from standard logging requirements
Unknown Regulatory / Permitting
Tier 3 Specific injection pipeline pressure test to 100 psi over permitted pressure required prior to injection
๐Ÿ“„ Page 2 of 10, Date: 4/30/2026
Enhanced testing protocol beyond basic permit data
Relative General Oilfield Services
Tier 3 SCADA monitoring with real-time alarms for tanks, separators, and flow rates
๐Ÿ“„ UIC Plan, Page 8
Advanced automation and monitoring setup
Relative General Oilfield Services
Tier 3 Facility co-located with planned oil wells on same pad, no third-party volumes planned initially
๐Ÿ“„ UIC Plan, Page 6
Integrated pad design for multiple wells, limiting initial scope to on-pad production
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pressure testing and pipeline integrity
Required prior to injection; immediate opportunity post-construction
SCADA installation and monitoring
Needed within six months of commissioning; time-sensitive for spill prevention
Directional drilling and surveying
Anti-collision modeling completed; signals active drilling phase