| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Surface use agreement executed for multiple wells (1H, 2H, 3H, 4H) from single pad, covering off-spacing in 1600-acre unit. ๐ Affidavit of Surface Damage Agreement, dated 12/15/2025 Secured landowner agreement for multi-well pad development, enabling efficient off-spacing drilling. |
2025-12-15 | General Oilfield Services |
| Tier 3 |
Production liner cemented in lateral with wet shoe and ability to frac out the shoe, enabling reduced west setback to 150' from east-west boundaries. ๐ Stipulations section, Commission Order No. 35507 Non-standard setback reduction based on specific cementing and frac design, indicating advanced engineering to optimize spacing in 1600-acre unit. |
Unknown | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit; cuttings collected in metal containers and hauled to IHD Solids Management. ๐ Stipulations and Disposal of Drill Cuttings section Environmental compliance choice for closed-loop drilling, specifying licensed disposal vendor. |
Unknown | Mud / Fluids |
| Tier 3 |
Facilities to be off-site with flowline to Albert North pad in NE SE of S27-T151-R102W. ๐ Proposed Work section Choice of off-site production facilities and shared pad infrastructure, deviating from on-pad setups. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator will not use diesel-based compounds in hydraulic stimulation, listing prohibited CAS numbers. ๐ Stimulation section Explicit avoidance of diesel in frac fluids, a regulatory-driven design choice. |
Unknown | Completions / Frac |