๐Ÿ›ข๏ธ OPSAL 5799 42-11 5B

Enerplus Resources USA Corporation ยท Williams County, ND ยท File #42890 ยท Generated 2026-05-13 02:19

API
3310506824
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe liner configuration for economic toe initiation, allowing pump-down of perforating guns on wireline without tubing.
๐Ÿ“„ Attachment 6, Wet Shoe section
Non-standard liner design to reduce costs in completion, not typical in basic permit data.
Unknown Completions / Frac
Tier 3 BLM notification regarding potential federal permit requirement for the 2560-acre spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele
Alerts to federal oversight, not evident in state permit alone.
2026-04-13 General Oilfield Services
Tier 3 Drill-back notification to adjacent operator Kraken Operating LLC, including wellbore diagram and commencement date.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Mandatory notification for wells traversing adjacent spacing units, highlighting inter-operator coordination.
2026-03-30 General Oilfield Services
Tier 3 Anti-collision report using gamma ray signatures and real-time surveys, with minimum separation factors evaluated.
๐Ÿ“„ Anticollision Report
Advanced anti-collision protocols beyond basic surveying, ensuring safe drilling in dense field.
2026-03-24 Directional Drilling
Tier 3 Indirect heater usage with NDIC setback exemption under Case No. 28949 Order No. 31500, allowing closer placement to wellhead.
๐Ÿ“„ Facility Statement
Exemption enables optimized facility layout, deviating from standard setbacks.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and anti-collision services
Anticollision report dated 2026-03-24 indicates active planning phase, with drilling start anticipated June 2025, creating immediate opportunity for survey and directional contractors.
Waste disposal and environmental services
Pre-selected licensed facilities for cuttings disposal, timed with spud notification requirement within 3 business days, signaling readiness for rig move-on.
Regulatory and permitting support
BLM notification on 2026-04-13 post-approval highlights potential federal delays, urging quick engagement of permitting consultants.