โ† Back to Daily Permits

๐Ÿ›ข๏ธ Twin Tractor 1-14-2H

Iron Oil Operating LLC ยท Mountrail County, ND ยท File #42892 ยท Generated 2026-05-13 02:20

API
3306105682
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Lateral designed with wet shoe sub and no ability to frac out the shoe, requiring bridge plug at toe for isolation before stimulation.
๐Ÿ“„ Page 4: WELLBORE INFORMATION; Geologic Prognosis section
Non-standard completion design for Bakken laterals, implying intent to initiate frac at toe stage and pump perforating guns through lateral.
Unknown Completions / Frac
Tier 3 Notice to off-unit operator waived per NDIC Order 31973, as Iron Oil operates adjacent spacing unit (Sections 23, 26, 35 T154N-R89W).
๐Ÿ“„ Letter dated May 1, 2026
Waiver indicates operator's control over nearby units, potentially simplifying frac notifications.
2026-05-01 Completions / Frac
Tier 3 Well located on aquifer requiring onsite NDIC inspection, closed mud system, impermeable liner, and specific setbacks (150' south, 100' north, 1220' east/west) within 1920-acre spacing unit.
๐Ÿ“„ Page 1: Stipulations
Indicates heightened regulatory scrutiny and design constraints not typical for non-aquifer Bakken wells, potentially delaying operations or increasing costs.
Unknown Mud / Fluids
Tier 3 Planned hydraulic fracturing: 80 stages, 15 million lbs proppant, 370 million bbls fluid.โฐ TIME-SENSITIVE
๐Ÿ“„ Geologic Prognosis section
High-intensity frac plan exceeds typical Bakken well designs, indicating aggressive development intent.
Unknown Completions / Frac
Tier 3 Cuttings disposal to Roughrider Disposal LLC Landfill in SW1/4 SW1/4 Sec 10 TWP 154N RG 95W, subject to weather/availability changes.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 6: Disposition of Cuttings
Pre-selected landfill vendor with contingencies, indicating operator's preference for specific disposal logistics.
Unknown General Oilfield Services
Tier 3 Contact NDIC Field Inspector Calob Werre at 701-822-0147 prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2: Construction Commencement Notification
Named specific inspector for pre-construction coordination, suggesting personalized regulatory relationship.
Unknown General Oilfield Services
Tier 3 Anti-collision protocol: Maintain 200 ft from active vertical wellbores, with potential frac size reductions near active wells.
๐Ÿ“„ Page 6: Anti-Collision Measures
Specific collision avoidance measures suggest proximity to active wells, not evident from basic permit data.
Unknown Directional Drilling
Tier 3 Executed surface use agreement for off-unit location, affidavit sworn in April 2026.
๐Ÿ“„ Affidavit of Off Unit Well Location
Confirms legal access secured, enabling off-spacing drilling not assumed from permit.
2026-04 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Cuttings disposal
Immediate need upon drilling start, with pre-selected Roughrider Disposal LLC, creating urgency for capacity confirmation.
Completions and liner services
Northern States Completions detailed in specs, timing post-casing for lateral completion.
Surveying and engineering
UELS and Uintah already engaged for plat and pad prep, opportunity for follow-on services during construction.