| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
BLM involvement noted for potential federal permit in spacing unitโฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele Federal oversight required, adding regulatory layer |
2026-04-21 | General Oilfield Services |
| Tier 3 |
Notice provided to adjacent operators Devon Energy Williston, LLC for off-spacing drillingโฐ TIME-SENSITIVE ๐ Drilling Permit Affidavit Compliance with NDIC Order 31973 for adjacent unit notification |
2026-03-25 | General Oilfield Services |
| Tier 3 |
Surface Use Agreement executed with landowners for off-lease drilling ๐ Affidavit by Jennings White Secures surface rights for multi-section operations |
2026-03-23 | Drilling Rigs |
| Tier 3 |
Anticollision report generated with specific separation factors and warnings ๐ Anticollision Report Detailed risk assessment for wellbore proximity |
2026-03-19 | General Oilfield Services |
| Tier 3 |
Hydraulic Fracture Stimulation using Diesel Fuels memo effective February 12, 2014, with Halliburton affidavit ๐ Hydraulic Fracturing Stimulation using Diesel Fuels memo Commitment to diesel-free fracking, based on historical regulatory memo |
2014-02-12 | Completions / Frac |
| Tier 3 |
East setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 2 Specific completion design for setback compliance, enabling fracking through shoe |
Unknown | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit required ๐ Page 2 Non-standard mud handling deviates from typical open pits, implying environmental compliance and specialized equipment needs |
Unknown | Mud / Fluids |
| Tier 3 |
Requirement to contact NDIC Field Inspector Dylan Roach at 701-770-1981 prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2 Indicates pre-construction coordination with regulatory oversight, potentially delaying operations if not complied with |
Unknown | General Oilfield Services |
| Tier 3 |
Anti-collision standards include real-time corrected surveys, 1.5 separation factor, and gamma ray geo-steering ๐ Page 7 Advanced anti-collision measures beyond basic planning, involving real-time tech |
Unknown | Directional Drilling |
| Tier 3 |
Remote or automatic shutoff devices required on all equipment ๐ Page 2 Enhances safety and regulatory compliance beyond basic permit requirements |
Unknown | General Oilfield Services |
| Tier 3 |
Surveys taken every 93'-100' and increased frequency for collision avoidance ๐ Page 7 Higher survey frequency than standard, indicating complex wellbore navigation |
Unknown | Directional Drilling |
| Tier 3 |
Authority granted to consolidate production equipment at a central location ๐ Page 2 Allows flexibility in facility design, potentially reducing pad footprint |
Unknown | General Oilfield Services |
| Tier 3 |
Well and production facility not on same pad ๐ Page 7 Separation of well and facility, potentially for regulatory or operational reasons |
Unknown | General Oilfield Services |