| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe sub with rupture pins and plug chamber for frac-out, allowing first stage pumping out the shoe. ๐ Completion Equipment section Specific completion design for frac operations, including intentional over-displacement, deviates from standard liner setups. |
Unknown | Completions / Frac |
| Tier 3 |
Email notification on 4/21/2026 about potential federal permit requirement due to spacing unit.โฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele Highlights federal involvement in what appears state-only, requiring BLM coordination. |
2026-04-21 | General Oilfield Services |
| Tier 3 |
Permit submitted on 04/09/2026 and approved on 05/05/2026. ๐ Page 10 Specific approval timeline shows a 26-day processing period, which may indicate regulatory backlog or operator urgency. |
2026-04-09 | General Oilfield Services |
| Tier 3 |
Directional plan shared with Devon Energy on 3/25/2026 for adjacent unit traversal.โฐ TIME-SENSITIVE ๐ Letter to Devon Compliance with Order No. 31973 for sharing plans with adjacent operators, indicating inter-operator data exchange. |
2026-03-25 | Directional Drilling |
| Tier 3 |
Anti-collision report generated on 3/19/2026 showing level 1 warnings for nearby wells. ๐ Anti-collision Report Detailed report with separation factors and warnings, beyond basic permit anti-collision mentions. |
2026-03-19 | Directional Drilling |
| Tier 3 |
Surface Use Agreement obtained on 3/3/2026 from landowners for off-lease drilling. ๐ Affidavit by Jennings White Affidavit confirms executed agreement for off-spacing units, essential for permit approval. |
2026-03-03 | Drilling Rigs |
| Tier 3 |
Plat surveyed and certified on 11/18/2025 by Eric L. Hearon. ๐ Plat section Pre-permit surveying date reveals early land preparation, potentially ahead of standard timelines. |
2025-11-18 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Dylan Roach at 701-770-1981 prior to location construction.โฐ TIME-SENSITIVE ๐ Page 2 Specifies a named field inspector for pre-construction coordination, indicating potential for operational oversight or delays not typical in standard permits. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator understands hydraulic fracture stimulation notice requirements to adjacent operators within 2640 feet.โฐ TIME-SENSITIVE ๐ Page 8 Acknowledgment of regulatory notice period for frac operations, implying potential for inter-operator coordination delays. |
Unknown | Completions / Frac |
| Tier 3 |
Anti-collision standards include real-time corrected surveys, 1.5 separation factor, and gamma ray steering around existing wellbores. ๐ Page 7 Detailed anti-collision protocols exceed basic permit requirements, revealing operator's risk mitigation strategy in a densely drilled area. |
Unknown | Directional Drilling |
| Tier 3 |
Surveys taken every 93'-100' and increased frequency for collision avoidance. ๐ Page 7 Non-standard survey frequency indicates heightened caution in lateral drilling, not routine in all permits. |
Unknown | Drilling Rigs |