๐Ÿ›ข๏ธ RS-Piepkorn-155-92-1208H-6

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42901 ยท Generated 2026-05-14 03:03

API
3306105686
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Completion design includes cemented liner with wet shoe sub, allowing intentional over-displacement by 2 bbls and frac out the shoe, followed by plug and perf.
๐Ÿ“„ Completion Equipment section
Wet shoe for frac initiation is a specific design choice not common in all Bakken completions, enabling efficient multi-stage fracs without perforating the shoe.
Unknown Completions / Frac
Tier 3 Requirement for closed mud system with no cuttings pit, indicating environmental compliance and potential need for specialized mud handling services.
๐Ÿ“„ Page 2, Stipulations
Closed systems are not standard in all NDIC permits and suggest operator's focus on minimizing environmental impact, potentially requiring vendors for mud recycling or disposal.
2026-05-05 Mud / Fluids
Tier 3 Mandatory contact with NDIC Field Inspector Dylan Roach at 701-770-1981 prior to location construction, specifying a named individual for oversight.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2, Stipulations
Named inspector contact is unusual and indicates potential for site-specific regulatory scrutiny, differing from generic NDIC notifications.
2026-05-05 General Oilfield Services
Tier 3 Wellbore within federal minerals area, requiring BLM coordination as noted in NDIC email.โฐ TIME-SENSITIVE
๐Ÿ“„ NDIC email dated 4/21/2026
Federal involvement adds regulatory complexity not present in state-only permits.
2026-04-21 General Oilfield Services
Tier 3 Affidavit confirms provision of directional drilling and completion plans to adjacent operator Devon Energy Williston, LLC, per Order 31973.
๐Ÿ“„ Drilling Permit Affidavit dated 3/25/2026
Demonstrates inter-operator coordination for cross-unit drilling, a non-routine step to avoid conflicts.
2026-03-25 Directional Drilling
Tier 3 Anti-collision standards require minimum 1.5 separation factor, real-time corrected surveys, and gamma ray geo-steering around existing wellbores.
๐Ÿ“„ Proposed Work section
Exceeds basic NDIC anti-collision rules, indicating proactive risk management in a densely drilled area.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and completion services, including mud systems, anti-collision surveying, and liner/fracturing equipment
Permit approved May 2026 with spud dates in April-May 2027; signals immediate prep for environmental and precision services ahead of drilling.
Regulatory and permitting support
Federal minerals require BLM coordination; named NDIC contacts indicate ongoing oversight, creating opportunities for compliance consultants.