๐Ÿ›ข๏ธ TUNNOCK 5303 12-2 2BX

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42902 ยท Generated 2026-05-14 03:03

API
3310506826
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner to enable frac out the shoe and economic toe initiation via wireline perforating guns, avoiding tubing conveyance.
๐Ÿ“„ Page 6 (Completion & Perforation) and Attachment 6 (Wet Shoe section)
Non-standard liner cementing technique that over-displaces cement to create uncemented annulus, facilitating cost-effective toe initiation in horizontal completions.
Unknown Completions / Frac
Tier 3 Drill-back notification provided to adjacent operator Devon Energy for horizontal wellbore traversing outside target spacing unit, including wellbore diagram and commencement date.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification (end of document)
Mandatory notification under NDIC Order No. 31848 for wells entering adjacent spacing units, highlighting inter-operator coordination in dense Bakken development.
2026-02-11 Completions / Frac
Tier 3 Anti-collision report with detailed separation factors (e.g., minimum 1.942 separation factor with nearby wells) using gamma ray signatures and real-time surveys.
๐Ÿ“„ Anti-collision Report (dated 12 January, 2026)
Proactive anti-collision planning in a field with multiple nearby horizontals, exceeding basic permit requirements by specifying survey frequencies and gamma ray correlation.
2026-01-12 Directional Drilling
Tier 3 Explicit avoidance of diesel-based stimulation fluids, listing prohibited CAS numbers (e.g., 68334-30-5 for Fuels, diesel).
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS section
Voluntary restriction on certain compounds in hydraulic fracturing, beyond regulatory minimums, possibly for environmental or water quality reasons.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and completion services
Anticipated drilling start July 15, 2025, with specified mud programs, cementing, and wet shoe liner, creating immediate opportunity for rig, cement, and MWD contractors.
Waste disposal services
Closed mud system and listed licensed facilities for cuttings disposal indicate ongoing need for environmental services post-spudding.